Publications

All Publications

586 KB

ESB Networks Response to CRU's Call for Evidence on Large Energy Users Connection Policy

Download PDF

542 KB

ESB Networks' response to CRU Consultation on Incentivising the Uptake of Time of Use Tariffs

Download PDF

254 KB

Benefits Insert Web

Download PDF

947 KB

ESB Networks Guidance to Electric Vehicle (EV) Charge Point Operators |947.34KB

Download PDF

574 KB

ESB Networks Response_(CRU202341) Electricity Generation and System Services Connection Policy

Download PDF

6 MB

2022 Environmental Performance Report |Download PDF 6.2MB

Download PDF

3 MB

Distribution Annual Performance Report 2022 for Consultation

Consultation on the ESB Networks Distribution System Annual Performance Report (APR) 2022

ESB Networks, in its capacity as Distribution System Operator, today publishes for consultation the draft Distribution System Annual Performance Report (APR) 2022. Aligning with the CRU’s requirements for PR5, this report is intended to provide customers, industry participants and other interested parties with a clear, accessible, comprehensive, but non-technical report on Distribution System activities for 2022.

Consultation Question

 Are there areas within the report that you feel require more detailed information?

 Next Steps

The consultation period will run for four weeks and will close at 17:30 on the Monday 18th September 2023. When the consultation closes, ESB Networks will review and consider all the comments and publish a final version pending CRU approval. 

Interested stakeholder’s views are invited and can be sent to consultations@esbnetworks.ie

Download PDF

412 KB

ESB Networks Consultation - Call for Input on DSO PR5 Incentives Multi-Year Plans 2024-2028

In its role as Distribution System Operator (DSO), ESB Networks is publishing this Call for Input Consultation in relation to the PR5 DSO Incentives concerning flexibility, visibility, enhancing the independent role of the DSO, and improving estimated restoration time accuracy for customers.  These align with Sections 8.4, 8.9, 8.10 & 8.11 of the CRU’s PR5 Regulatory Framework Incentives and Reporting (CRU/20/154) determination. ESB Networks has previously published the Multi-Year Plans for 2023-2027. The final four years of those plans (2023 – 2027) are the basis for this Call for Input into the development of the 2024-2028 plans.

 Consultation question

 Via this Call for Input Consultation, we invite stakeholder views on and input into the proposed approach in advance of our finalisation of the 2024-2028 Multi Year Plans, and our subsequent submission of same to the CRU.

 Next Steps

The consultation period will run for four weeks, beginning on 14th August 2023, and closing on 11th September 2023 at 17:00pm.

***8TH SEPTEMBER 2023 UPDATE: Please note that the DSO has extended the deadline to 17:00 on 29th September 2023 for the Flexibility incentive only (Section 2.1 of the consultation paper).  The deadline for the other three incentives remains the 11th September 2023 ***

Interested stakeholder’s views are invited and can be sent to consultations@esbnetworks.ie.

Download PDF

747 KB

ESB Networks Call for Input: 15-20% Flexible System Demand Strategy

Download PDF

921 KB

ESB Networks Call for Input: Market Design Strategy

Download PDF

924 KB

ESB Networks Call for Input: Power System Requirements Strategy

 
Download PDF

881 KB

ESB Networks Call for Input: Behind-the-Meter Infrastructure Strategy

Download PDF
4 / 46
3 4 5
. . .
44 45 46