Publications


Consultation on ESB Networks’ Investment Plan Approach for Price Review 6 (PR6) – July 2024

ESB Networks is committed to developing and delivering a plan for PR6, in collaboration with our customers and stakeholders, to support the transformational change needed to bring about a more secure, affordable and sustainable energy future for individuals and communities across Ireland.

To help further shape these plans, your feedback would be very much appreciated.

The consultation period will begin on Friday 12th July 2024, and will close on Friday 30th August 2024 at 17:00pm. 

All comments are invited and can be sent directly to PR6Engagement@esb.ie 

Download PDF

Generator Connections

520 KB

Functional Spec 18152 for the Installation of Ducts and Ancillary Structures for 20kV Underground Power Cables & Associated Communications Cables for Contestable Projects

Download PDF

304 KB

Functional Specification 18150 for the Installation of Ducts and Ancillary Structures for 38KV Underground Power Cables and Associated Communication Cables for Contestable Projects

Download PDF

848 KB

Functional Specification 18151 for the Installation of 38KV Underground Power Cables for Contestable Projects

Download PDF

837 KB

Functional Specification 18153 for the Installation of 20KV UG Power Cables for Contestable Projects

Download PDF

169 KB

Gate 2 Connection Offers - Timeline and Direction

This document sets out the timeline and the process for roll-out of offers to Gate 2 Groups.

Download PDF

44 KB

Gate_3 _Project_Plan_May_2011

This document outlines the high level summary of the System Operators Gate 3 Project Plan.  This revision reflects the impact of the introduction of Distribution contestability on the Plan, and records when PGOR (Possible Generator Output reports) will be available for issue. It also provides the expected date when Final Constraint Reports will be available.

Download PDF

3 MB

General Spec 18133 for Contestable Built HV Substations

Download PDF

333 KB

General Spec Document 18149 for Contestable Built Underground Networks

Download PDF

529 KB

General Specification Document 18134 for Contestable Built MV Substations Equipped with Embedded Generation Interface Protection (EGIP)

Download PDF

40 KB

Generator Connections - Complaints Procedure

This document outlines the procedure you need to take if you have a complaint about your Connection Offer or other aspects of your Generation connection to the Distribution System.

Download PDF

306 KB

Generator Developers Information Pack

This document is issued by ESB Networks as a guide to Developers of generation projects to give an understanding of the connection process for both Non-Contestable and Contestable Generator projects.

Download PDF

171 KB

Guidelines for costs and applicability of EGIP (Embedded Generation Interface Protection).

This documents presents Guidelines for costs and applicability of EGIP (Embedded Generation Interface Protection).

Download PDF
4 / 6
1 2 3 4 5 6