Publications
Consultation on ESB Networks’ Investment Plan Approach for Price Review 6 (PR6) – July 2024
ESB Networks is committed to developing and delivering a plan for PR6, in collaboration with our customers and stakeholders, to support the transformational change needed to bring about a more secure, affordable and sustainable energy future for individuals and communities across Ireland.
To help further shape these plans, your feedback would be very much appreciated.
The consultation period will begin on Friday 12th July 2024, and will close on Friday 30th August 2024 at 17:00pm.
All comments are invited and can be sent directly to PR6Engagement@esb.ie
Download PDFGenerator Connections
520 KB
Functional Spec 18152 for the Installation of Ducts and Ancillary Structures for 20kV Underground Power Cables & Associated Communications Cables for Contestable Projects
Download PDF304 KB
Functional Specification 18150 for the Installation of Ducts and Ancillary Structures for 38KV Underground Power Cables and Associated Communication Cables for Contestable Projects
Download PDF848 KB
Functional Specification 18151 for the Installation of 38KV Underground Power Cables for Contestable Projects
Download PDF837 KB
Functional Specification 18153 for the Installation of 20KV UG Power Cables for Contestable Projects
Download PDF169 KB
Gate 2 Connection Offers - Timeline and Direction
This document sets out the timeline and the process for roll-out of offers to Gate 2 Groups.
44 KB
Gate_3 _Project_Plan_May_2011
This document outlines the high level summary of the System Operators Gate 3 Project Plan. This revision reflects the impact of the introduction of Distribution contestability on the Plan, and records when PGOR (Possible Generator Output reports) will be available for issue. It also provides the expected date when Final Constraint Reports will be available.
529 KB
General Specification Document 18134 for Contestable Built MV Substations Equipped with Embedded Generation Interface Protection (EGIP)
Download PDF40 KB
Generator Connections - Complaints Procedure
This document outlines the procedure you need to take if you have a complaint about your Connection Offer or other aspects of your Generation connection to the Distribution System.
306 KB
Generator Developers Information Pack
This document is issued by ESB Networks as a guide to Developers of generation projects to give an understanding of the connection process for both Non-Contestable and Contestable Generator projects.
171 KB
Guidelines for costs and applicability of EGIP (Embedded Generation Interface Protection).
This documents presents Guidelines for costs and applicability of EGIP (Embedded Generation Interface Protection).