Publications
Generator Connections
320 KB
2022 Batch (ECP-2.3) Results - Joint SO Publication
This report contains the initial list of applicants that will be processed under Category A as part of the 2022 ECP-2.3 batch. As per the decision paper, the first 25 projects in category A were selected on the basis of renewable output, with the projects having the largest volume of renewable GWhrs/yr generated being granted the highest priority. The subsequent 59 projects were selected in order of planning permission grant date. There is a cap of 10 primarily storage and other system service technology projects in each ECP-2 batch - apart from these projects, all eligible applications to ECP-2.3 were accepted into the Category A batch.
268 KB
2023 Batch (ECP-2.4) Results - Joint SO Publication
581 KB
conditions governing connection operation small scale generation
504 KB
Mini-Generation Installation Confirmation Certificate (NC7-01-R1)
646 KB
Power Generating Module Document (PGMD) for Controllable Power Park Modules (PPMs) - All Topologies except 2
Step by step connection guide of pre and post energisation requirements for DSO wind and solar PV generators 1MW and above which are any Topology except 2 (no DSO reactive power requirements). EU Network Code 2016/631 on Requirements for Generators refers.
618 KB
Power Generating Module Document (PGMD) for Controllable Power Park Modules (PPMs) - Topology 2
Step by step connection guide of pre and post energisation requirements for DSO wind and solar PV generators 1MW and above which are Topology 2 (includes DSO reactive power requirements). EU Network Code 2016/631 on Requirements for Generator refers.