Publications

All Publications

169 KB

Gate 2 Connection Offers - Timeline and Direction

This document sets out the timeline and the process for roll-out of offers to Gate 2 Groups.

Download PDF

44 KB

Gate_3 _Project_Plan_May_2011

This document outlines the high level summary of the System Operators Gate 3 Project Plan.  This revision reflects the impact of the introduction of Distribution contestability on the Plan, and records when PGOR (Possible Generator Output reports) will be available for issue. It also provides the expected date when Final Constraint Reports will be available.

Download PDF

631 KB

General Conditions for Connection of Industrial and Commercial Customers and Generators to the Distribution System

This document sets out the conditions for connecting a premises to the electricity distribution system for loads greater than or equal to 100 Kilovolt Amps (kVA).

Download PDF

3 MB

General Spec 18133 for Contestable Built HV Substations

Download PDF

333 KB

General Spec Document 18149 for Contestable Built Underground Networks

Download PDF

529 KB

General Specification Document 18134 for Contestable Built MV Substations Equipped with Embedded Generation Interface Protection (EGIP)

Download PDF

326 KB

General Specification for Business Low Voltage (LV) Underground Service

This document outlines the general specification for business low voltage (LV) underground service.

Download PDF

40 KB

Generator Connections - Complaints Procedure

This document outlines the procedure you need to take if you have a complaint about your Connection Offer or other aspects of your Generation connection to the Distribution System.

Download PDF

306 KB

Generator Developers Information Pack

This document is issued by ESB Networks as a guide to Developers of generation projects to give an understanding of the connection process for both Non-Contestable and Contestable Generator projects.

Download PDF

82 KB

Guide to European Communities (Access to Information on the Environment) Regulations 2007 - 2014

Under the European Communities (Access to Information on the Environment) Regulations 2007-2011 (the Regulations) you are entitled to request access to information on the environment that is held by ESB.

Download PDF

534 KB

Guide to the Process for Connection of Demand Customers to the Distribution System

This guide is designed to illustrate the steps in obtaining a connection to the Distribution System for demand customers

Download PDF

311 KB

Guideline for the Application of Connection Network Codes to Existing Users V1.0

ESB Networks and EirGrid have issued a joint guideline for the application to existing users of Commission Regulation (EU) 2016/631 establishing a network code on requirements for grid connection of generators (RfG), Commission Regulation (EU) 2016/1388 establishing a Network Code on Demand Connection (DCC) and Commission Regulation (EU) 2016/1447 establishing a network code on requirements for grid connection high voltage direct current systems and direct current-connected power park modules (HVDC).

The purpose of this document is to detail the criteria which will be used by ESB Networks and  EirGrid in relation to the modernisation, refurbishment or equipment replacement for existing users which would require a user to comply in part or in full with the requirements of the above mentioned European Connection Network Codes.

If you have any queries in relation to this guideline please send an email to distcodepanel@esb.ie

Download PDF
31 / 45
1
. . .
29 30 31 32 33
. . .
45