Publications

Application Forms

105 KB

Manufacturer’s ELS Product Declaration NC7-03-R1

ESB Networks DAC requires the information requested on this form to manage your electricity supply connection. As the Distribution System Operator, this information is also required to enable ESB Networks DAC to manage the electricity network.
Download PDF

487 KB

Application for Relocation of Pole or Line (NW1)

This application form is for customers who wish to apply to relocate a pole or line. NW1 |ESB Networks

Download PDF

109 KB

DSO Capacity Release Form

On the 10th June 2020, the Commission for Regulation of Utilities (CRU) published a  Decision Paper - Enduring Connection Policy Stage 2 (ECP-2) CRU/20/060 (the “CRU Decision Paper”), following a CRU Consultation - Enduring Connection Policy Stage 2 (ECP-2) - Proposed Decision CRU/19/143. 

As directed by the CRU, this standard application form has been published to facilitate the implementation of Section 2.9 of the CRU Decision Paper. This application form should not be used for any other purpose. 

Download PDF

208 KB

ECP-2-declaration-of-community-led-energy-project-(100-owned)

Download PDF

531 KB

ESBN_Form NC7

Application Form for Mini-Generator Connections at LV with an installed generation capacity between 25A  (~6kVA) and 72A (~17kVA) for single phase connections and between 16A (~11kVA) and 72A (~50kVA) for three phase connections. NC7 | ESB Networks

Download PDF

534 KB

Guide to the Process for Connection of Demand Customers to the Distribution System

This guide is designed to illustrate the steps in obtaining a connection to the Distribution System for demand customers

Download PDF

1 MB

New Generator Connection Application (NC5)

This form should be completed by customers who want a new generator connected to the distribution system.

Download PDF

242 KB

New Generator Connection Application (NC5A)

New Generator Connection Application. This form should be completed by customers who want a new generator connected to the distribution system.

Download PDF

603 KB

New or Changed Unmetered Connection Application (includes Public Lighting) (NC4)

This application form is for customers who wish to apply for a connection to the electricity distribution system for unmetered connections.  NC4 |ESB Networks 

Download PDF