237 KB
Application for Relocation of Pole or Line (NW1)
This application form is for customers who wish to apply to relocate a pole or line. NW1 |ESB Networks
109 KB
DSO Capacity Release Form
On the 10th June 2020, the Commission for Regulation of Utilities (CRU) published a Decision Paper - Enduring Connection Policy Stage 2 (ECP-2) CRU/20/060 (the “CRU Decision Paper”), following a CRU Consultation - Enduring Connection Policy Stage 2 (ECP-2) - Proposed Decision CRU/19/143.
As directed by the CRU, this standard application form has been published to facilitate the implementation of Section 2.9 of the CRU Decision Paper. This application form should not be used for any other purpose.
531 KB
ESBN_Form NC7
Application Form for Mini-Generator Connections at LV with an installed generation capacity between 25A (~6kVA) and 72A (~17kVA) for single phase connections and between 16A (~11kVA) and 72A (~50kVA) for three phase connections. NC7 | ESB Networks
534 KB
Guide to the Process for Connection of Demand Customers to the Distribution System
This guide is designed to illustrate the steps in obtaining a connection to the Distribution System for demand customers
1 MB
New Generator Connection Application (NC5)
This form should be completed by customers who want a new generator connected to the distribution system.
242 KB
New Generator Connection Application (NC5A)
New Generator Connection Application. This form should be completed by customers who want a new generator connected to the distribution system.
220 KB
New or Changed Unmetered Connection Application (includes Public Lighting) (NC4)
This application form is for customers who wish to apply for a connection to the electricity distribution system for unmetered connections. NC4 |ESB Networks