Publications

All Publications

1 MB

Strategic Stakeholder Engagement Framework

The purpose of this consultation is to seek views and feedback on the information detailed in the Strategic Stakeholder publications (Strategic Stakeholder Engagement Framework and Strategic Stakeholder Engagement Plan 2020).

Strategic Stakeholder Engagement Plan 2020 | PDF | 1MB

Background and Process

In order to continually enhance and develop our engagement approach, ESB Networks is consulting with customers and stakeholders on its approach to stakeholder engagement (set out in the Strategic Stakeholder Engagement Framework) and its planned key area of engagement activity during 2020 (set out in the Strategic Stakeholder Engagement Plan 2020).

Associated with this, ESB Networks is required to submit an annual report on its stakeholder engagement strategy and activities to enable the CRU to assess and score ESB Networks on the quality, good implementation and effectiveness of its stakeholder strategy in the previous year. This is detailed in the CRU decision paper Reporting and Incentives under PR4, (CER/18/087).

Consultation Question

Do you have any comments on the ESB Networks Strategic Stakeholder Engagement Framework and Strategic Stakeholder Engagement Plan 2020?

Next Steps

The consultation period will run for four (4) weeks and will close on the 20th December 2019. When the consultation closes, ESB Networks will review and consider all the comments and publish a final version of the Strategic Stakeholder Engagement Framework & the Strategic Stakeholder Engagement Plan 2020.

Please send your comments to:

Contact Name: Strategic Engagement Manager, ESB Networks

Contact Email: stakeholder@esbnetworks.ie

Closing Date for Responses: 5pm on 17th January 2020.

PLEASE NOTE: ESB Networks may publish responses that we receive, so if you don’t want your response published you should mark your response as confidential.

 

Download PDF

967 KB

Summary of Responses to Consultation DSO-TSO Multi-Year Plan 2023-2027 Final

2023 Consultation Response Document

EirGrid and ESB Networks, in their respective capacities as Transmission System Operator (TSO) and Distribution System Operator (DSO),  are now jointly publishing their response to the consultation on the DSO/TSO Multi-Year Plan 2023 – 2027.

Following closure of the public consultation on 10 March 2023, ESB Networks and EirGrid are jointly publishing this detailed consultation response, acknowledging, and reflecting on, the respondents’ feedback.

Having reviewed the responses, a revised Multi-Year Plan was submitted to the CRU in May 2023, which is also available on the EirGrid library and ESB Networks website.

Download PDF

264 KB

Summary of Responses to Consultation on PR5 TSO/TAO Joint Multi-year Incentive Plan 2022-2026

Download PDF

3 MB

Summary of Standard Specification for ESB Networks 110kV Ducting

This document provides a guide to the requirements of ESB Networks in relation to electricity installations in housing schemes.

Download PDF

9 MB

Summary of Standard Specification for ESB Networks MVLV Ducting

Summary of Standard Specification for ESB Networks MVLV Ducting

Download PDF

374 KB

Supplemental application for Modifications to Generation Connection Offers

This application form should be completed if your project is being processed within the group processing approach GPA, and you wish the system operators to use assumed project data rather than specific project data provided by you.

Download PDF

1018 KB

System Operation

Operational roles and responsibilities for system operators and users under normal conditions. The detailed requirements are being developed and will be transferred into our existing Distribution Code. This code includes outage planning and data exchange.

Download PDF

71 KB

Terms & Conditions For Connection - Domestic Premises

Download PDF

138 KB

Terms of Reference - ESB Networks Innovation Stakeholder Panel

In November 2020, ESB Networks established our new Innovation Stakeholder Panel. This panel will provide a platform for enabling open discussion and feedback on our Innovation Strategy, projects and activities.

Following a call for expressions of interest in October 2020, we selected 19 panel members based on a number of criteria, across 10 stakeholder sectors. These panel members will represent our stakeholder sectors with a reach nationally and internationally. This document details the Terms of Reference for the Stakeholder Innovation Panel, it outlines the purpose and objective of the panel, the structure and timelines for meetings,  and the panel membership and sectors represented. 

Download PDF

1 MB

The Dingle Electrification Project - Sharing Learnings from the Peer to Peer Energy Trading Objective

This document outlines the activities undertaken by ESB Networks in furtherance of the P2P objective of the Dingle Project, the learnings garnered from these activities and proposed future steps to be undertaken to increase learnings on the potential impact of P2P energy on the operation of the distribution network.

Download PDF

5 MB

The Dingle Electrification Project-Customer Flexibility Trial

The Dingle Project explored the impact of low carbon and clean energy enabling technologies on the electricity network and evaluated the potential for these technologies, installed at residential and small business settings, to offer support to the grid. This report outlines the insights and observations from this trial.

 

Download PDF

213 KB

Transition of voltage control modes for windfarms

Modification No. 37 - Transition of Voltage Control Modes for Windfarms


Effective Date 23/02/2016

Download PDF
44 / 45
1 2 3
. . .
43 44 45