Publications

Generator Connections

12 KB

Customer Connection Method Sub Group Meetings Schedule

The customer connection method sub-group meetings are the primary connection method discussion vehicle for customers, this document is a revised schedule for these meetings.

Download PDF

428 KB

Details on processing applications outside of GPA.

This document outlines the steps by which an application is processed which is not the normal GPA, it also includes factors that make an eligible non GPA application.

Download PDF

193 KB

DSO Contracted Non-Renewable Generators Q2 2024

Download PDF

473 KB

DSO Contracted Renewable Generators Q2 2024

Download PDF

266 KB

DSO Energised Non-Renewable Generators Q2 2024

Download PDF

989 KB

DSO Energised Renewable Generators Q2 2024

Download PDF

448 KB

ECP-2 Capacity Release DSO Applications

As outlined in Section 2.9 of  the ECP-2 Decision paper, all projects contracted pre ECP-1 (but not those that folded into ECP-1) were given a final opportunity by ESB Networks and Eirgrid to terminate their connection agreement and release their full contracted MEC on the same terms and conditions for capacity release outlined in CER/16/284 (including 80% refund of first stage payment).

Please click the link below to view the full list of DSO Projects who availed of Final Capacity Release:

Download PDF

457 KB

ECP-2 Ruleset

The ruleset set out in this document (this ruleset) is annexed to the CRU's decision on the Enduring Connection Policy - Stage 2 (ECP-2 decision) and should be read in conjunction with this decision.

This ruleset applies to existing and New Applicants for connection to either the transmission or distribution systems, with the exceptions listed below:

This ruleset does not apply to:

• Demand connections
• Micro-generation
• New interconnector connections
• Offshore connections

This ruleset applies to Existing Applicants to the extent set out in Section 2.1.

Download PDF

249 KB

ECP-2.1 Category B _ C Batch Results - July 2022

Final Results for successful ECP-2.1 Category B and Category C applicants.

Download PDF

208 KB

ECP-2-declaration-of-community-led-energy-project-(100-owned)

Download PDF

96 KB

ESB Networks NC8 Form

Download PDF

531 KB

ESBN_Form NC7

Application Form for Mini-Generator Connections at LV with an installed generation capacity between 25A  (~6kVA) and 72A (~17kVA) for single phase connections and between 16A (~11kVA) and 72A (~50kVA) for three phase connections. NC7 | ESB Networks

Download PDF
3 / 6
1 2 3 4 5 6