Publications

Distribution Code

110 KB

Registered Capacity

Modification No. 25 - Registered Capacity. 


Effective Date 13/08/2014

Download PDF

1001 KB

Requirements for Generators

Connection requirements for new generators. The detailed requirements currently being developed and transferred into our existing Distribution Code. They will only apply to new generators whose plant procured from May 2018 onwards.

Download PDF

382 KB

Safety Co-ordination (DOC 11) - Modification No. 38

Modification No 38 Safety Procedures

Effective Date 23/02/2016

Download PDF

263 KB

Safety Procedures - Modification No. 39

Modification No. 39 - Safety Procedures

Effective Date 23/02/2016

Download PDF

1018 KB

System Operation

Operational roles and responsibilities for system operators and users under normal conditions. The detailed requirements are being developed and will be transferred into our existing Distribution Code. This code includes outage planning and data exchange.

Download PDF

213 KB

Transition of voltage control modes for windfarms

Modification No. 37 - Transition of Voltage Control Modes for Windfarms


Effective Date 23/02/2016

Download PDF

213 KB

WFPS Fault Ride Through

Modification No. 31 - WFPS Fault Ride Through.


Effective Date 23/02/2015

Download PDF

222 KB

WFPS Voltage Regulation

Modification No. 32 - WFPS Voltage Regulation. 


Effective Date 23/02/2015

Download PDF

216 KB

WFPS Voltage Step Change

Modification No. 33 - WFPS Voltage Step Change. 


Effective Date 23/02/2015

Download PDF

909 KB

Wind Farm Distribution Code Testing

This document sets out the agreed approach between the TSO and the DSO in relation to Distribution Code Compliance Testing process for controllable wind farm power stations (WFPS) with a registered capacity of 5 MW or more.

Download PDF
9 / 9
1 2 3
. . .
7 8 9