Publications


Consultation on ESB Networks’ Investment Plan Approach for Price Review 6 (PR6) – July 2024

ESB Networks is committed to developing and delivering a plan for PR6, in collaboration with our customers and stakeholders, to support the transformational change needed to bring about a more secure, affordable and sustainable energy future for individuals and communities across Ireland.

To help further shape these plans, your feedback would be very much appreciated.

The consultation period will begin on Friday 12th July 2024, and will close on Friday 30th August 2024 at 17:00pm. 

All comments are invited and can be sent directly to PR6Engagement@esb.ie 

Download PDF

Charges

614 KB

ESB Networks DAC Statement of Charges PDF |1.5MB

This document lists the current connection charges, distribution use of system charges (DUoS) and other service charges applied by ESB Networks DAC. in its role as Distribution System Operator.

Download PDF

496 KB

ESB Networks Standard Prices for Generator Connections 2024

Download PDF

253 KB

Schedule of Approved O&M Charges 2023

Download PDF

178 KB

Basis of Charges for Connection to the Distribution System

This document sets out the basis on which charges for connection to the Distribution System are calculated and applied by ESB Networks DAC. in its role as the Distribution System Operator.

Download PDF

97 KB

Distribution Loss Adjustment Factors

This document contains a table listing the current Distribution Loss Adjustment Factors.

Download PDF

125 KB

Rules for Application of Transactional Charges for Additional Services to Use of System

On an annual basis, CER approves these charges to apply for services carried out on foot of special requests made by Suppliers. This document outlines the rules for applying such charges.

Download PDF

330 KB

Joint DSO TSO Fees _amp_ Process for Connection Offer Modification

This document outlines a revised process for dealing with modification requests and the fees chargeable to the customer (Section 3) when applying for modifications to Connection Offers issued by either ESB Networks, in its role as the DSO, or EirGrid, in its role as the TSO (together known as the "System Operators or SOs").

Download PDF

290 KB

Joint TSO_DSO Group Processing Approach Charging and Rebating Principles

The purpose of this paper is to provide applicants seeking to connect under the Group Processing Approach with a clear set of guidelines explaining the rationale behind and methodology in place for the connection charging process.

Download PDF