Publications
Charges
740 KB
ESB Networks DAC Statement of Charges PDF |1.5MB
This document lists the current connection charges, distribution use of system charges (DUoS) and other service charges applied by ESB Networks DAC. in its role as Distribution System Operator.
178 KB
Basis of Charges for Connection to the Distribution System
This document sets out the basis on which charges for connection to the Distribution System are calculated and applied by ESB Networks DAC. in its role as the Distribution System Operator.
97 KB
Distribution Loss Adjustment Factors
This document contains a table listing the current Distribution Loss Adjustment Factors.
125 KB
Rules for Application of Transactional Charges for Additional Services to Use of System
On an annual basis, CER approves these charges to apply for services carried out on foot of special requests made by Suppliers. This document outlines the rules for applying such charges.
330 KB
Joint DSO TSO Fees _amp_ Process for Connection Offer Modification
This document outlines a revised process for dealing with modification requests and the fees chargeable to the customer (Section 3) when applying for modifications to Connection Offers issued by either ESB Networks, in its role as the DSO, or EirGrid, in its role as the TSO (together known as the "System Operators or SOs").
290 KB
Joint TSO_DSO Group Processing Approach Charging and Rebating Principles
The purpose of this paper is to provide applicants seeking to connect under the Group Processing Approach with a clear set of guidelines explaining the rationale behind and methodology in place for the connection charging process.