Skip to Content
For emergencies: Call 1800 372 999
Gaeilge

FOI Disclosure Logs

FOI00978

Status Refused
Date received 30 Oct 2025
Date of decision 11 Nov 2025
Category of requester Client
Details of request

This request relates to cutting down a tree at this location link :- https://maps.app.goo.gl/***

Request

All assessments carried out in advance relation to cutting this tree and the extent of works required to it.  Any ESB arborist report carried out in relation to this tree. ESB decision and determination of whether this in the landowners responsibility or ESB responsibility. Any post cutting reports.

FOI00977

Status Handled Outside FOI/Withdrawn
Date received 24 Oct 2025
Date of decision 14 Nov 2025
Category of requester Client
Details of request

A: Grid Performance & Reliability Metrics 2020 - 2024 inclusive

B: Customer Minutes Lost (CML) / SAIDI data - Broken down rural vs urban - or rural only. - Storm days vs non-storm days separated

C:  Customer Interruptions (CI) / SAIFI data - Broken down rural vs urban - or rural only. - Duration distribution of outages - Frequency by cause / storm-related vs non-storm-related

D:  Outage incident records - Date, time, and duration of each outage - Geographic location (coordinates or feeder ID) - Number of customers affected - Cause of outage (cause classification, or storm vs non-storm) - Storm identifier - Restoration time

E:  Meteorological conditions during storm outages  (granular data needed) -  Wind speed -  Storm names and classifications -  Weather warnings issued (orange/red alerts)

F:  Storm response data  - Crew deployment times during recent storms (Eowyn, Amy)  - Resource allocation during emergencies  - Restoration prioritization protocols

G:  Detailed data for Storm Eowyn and Storm Amy  - Complete outage maps  - Timeline of faults and restorations  - Weather conditions throughout events  - County-by-county impact analysis  -  Rural-specific analysis  - Lessons learned reports

H:  Distribution network topology - Rural feeder lengths and routes - Overhead vs underground cable ratios by region - Substation locations and capacities - Network voltage levels (MV/LV) - Radial vs meshed network sections

I:  Asset age and condition data - Pole age distribution in rural areas

J:  Microgeneration connection data - Number and location of connections by county - Capacity by technology type (solar PV, wind, etc.) - Connection dates (growth trends) - Generation profiles (if available)

K:  Demand profiles  - Typical rural load curves (daily/seasonal)  - Peak demand times  - Load distribution across rural feeders

L:  Critical loads identification  - Locations of hospitals, emergency services, communication infrastructure  - Essential services in rural areas  - Priority restoration targets

M:  Power quality measurements  - Voltage sag/swell events  - Frequency excursions  - Correlation with outage events - Data from rural vs urban locations

N:  Automation and sectionalisation  - Locations of automated switches in rural networks  - Remote isolation capabilities,   - Typical fault isolation times

O:  Future Planning -  Network development plans for rural areas -

FOI00976

Status Part-Granted
Date received 10 Oct 2025
Date of decision 03 Nov 2025
Category of requester Business / Interest Group
Details of request

Please send me all information you hold in relation to my New Commercial Connection Application no. **** I am making this request under the Freedom of Information Act.

FOI00974

Status Refused
Date received 06 Oct 2025
Date of decision 13 Oct 2025
Category of requester Client
Details of request

Under the FOI Act 2014, I am seeking the release of records relating to the connection of the site at Shackleton Road in Celbridge (planning ref 2460497) to the grid by the ESB or any relevant contractors or bodies who carry out such work on ESB's behalf.

Specifically, I am seeking records that relate to the expected connection date or any indication of same. I would like my search to include any lists or chains of correspondence that refer to any likely delays in relation to this site's connection.

FOI00973

Status Withdrawn
Date received 03 Oct 2025
Date of decision 06 Oct 2025
Category of requester Business / Interest Group
Details of request

I am working as a GIS administrator on behalf of Waterways Ireland. I was wondering if you would be able to provide us with a map service of your infrastructure so we can overlay on our internal GIS system.

FOI00961

Status Refused
Date received 01 Sep 2025
Date of decision 03 Sep 2025
Category of requester Client
Details of request

I note an article on Irish Independents website by Paul Deering from the Sligo Champion dated 22nd August which confirms ESB networks plans for "timber and vegetation surveying and clearing works are scheduled to take place in identified areas over the coming months".

I kindly request the scoping document that was issued to ESB contractors for this project, in particular any documentation that identifies the clearance distance is being implemented between existing ESB lines and forestry plantations.

FOI00960

Status Refused
Date received 28 Aug 2025
Date of decision 03 Sep 2025
Category of requester Business / Interest Group
Details of request
(a)any contracts or other commercial agreements for the provision of media monitoring services to include all tender documents, the name of the third-party service provider(s), the cost of the service – with a breakdown if the cost is apportioned across different elements of the overall service, and the current term of the contract.

FOI00946

Status Withdrawn
Date received 28 Aug 2025
Date of decision 12 Aug 2025
Category of requester Business / Interest Group
Details of request
I'm looking for a contact to assist me with getting a suite of drawings for fencing to substations. I have a current drawing PE689-D559-003-005-000 for a 5m double gate for a 38KV substation gate. Are there standard drawing for other sizes, other substations types, single gates and personnel gates? Please respond

FOI00957

Status Refused
Date received 26 Aug 2025
Date of decision 02 Sep 2025
Category of requester Client
Details of request

You might provide to me a list of Insurance companies that ESB/ESB Networks uses.

If you cannot process this request, please forward to me the relevant forms required to request this information.

FOI00953

Status Request transferred
Date received 21 Aug 2025
Date of decision 05 Sep 2025
Category of requester Client
Details of request

1. Grid Connection Applications & Agreements

Any applications submitted for grid connection for the ***

Connection offer letters, agreements, and related correspondence.

Internal memos or reports on grid capacity, feasibility, network impacts, or potential curtailment.

2. Technical Studies & Assessments

Feasibility studies, grid impact studies, network analyses, or technical evaluations involving the project.

Internal memos or reports on electrical safety, *** integration, or emergency mitigation.

3. Correspondence and Engagement

Emails, letters, or meeting notes between ESB Networks and the project developer (***) or their representatives.

Correspondence between ESB Networks and ****l, or other statutory bodies regarding the project.

Internal discussions or advice relating to future phases, ***/fire safety, or cumulative impacts on the electricity network.

4. Geospatial and Mapping Data

Any maps, GIS data, or spatial analyses showing the project area in relation to network routes, substations, or electrical infrastructure. Records showing potential constraints, overlays, or mitigation measures relevant to the project’s connection to the grid.

FOI00952

Status Refused
Date received 19 Aug 2025
Date of decision 05 Sep 2025
Category of requester Business / Interest Group
Details of request

This is a request for access to records under Section 12(1) of the Freedom of Information Act 2014.We request copies of any and all records held by you — including reports, plans, projections, correspondence, internal memoranda, maps, and capacity studies — relating to:

1. The number of 220kV substations planned or projected to be built in the Southwest region over the next 40 years.

2. The number of 110kV substations planned or projected for the Southwest region over the next40 years.

3. The number of 38/40kV substations planned or projected for the Southwest region over the next 40 years.

4. The rationale for proposing a 220kV substation at Ballysallagh given its proximity to Knockraha substation, including any capacity assessments, cost-benefit analysis, oroperational need studies.

5. How Ballysallagh 220kV substation would integrate with the national grid, including assessments of forecast demand, industrial development, or strategic network planning.

6. Planned or projected overhead lines or underground services from Ballysallagh 220kV station over the next 40 years.

FOI00950

Status Refused
Date received 06 Aug 2025
Date of decision 07 Aug 2025
Category of requester Client
Details of request

1. What is the E.S.B.'s or by extension the Irish Government's current policy regarding the Poolbeg chimneys?

2. Though not particularly old, they have become an iconic landmark in Dublin. Are the chimneys regularly attended to, as in cared for, looked after, painted etc. beyond mere health and safety considerations by whom and how often?

3. If the Poolbeg chimneys are not being regularly attended to, is it the E.S.B 's / Government's policy to let them fall into disrepair until they will have to be taken down, or crumble down?

4. Are there any plans to keep and preserve Poolbeg now or in the pipeline. If so what are the plans?

5. How much is the Poolbeg site costing the tax payer annually to sit there unused commercially or even culturally?

6. Is Poolbeg, i e. the land where the chimneys are located which  belongs to the state, currently up for tender to potential buyers? If so at what current price and what official offers to purchase have been received, who are they and what are their plans for the site?

7. Can you quantify how many people have contacted the E.S.B. / Government by letter, e-mail, fax, text, in person etc requesting or petitioning for the chimneys to remain and be refurbished and to stay on the Dublin skyline?

8. Finally do the E.S.B. or Government have any intention now or at some later time, to ask the citizens of Dublin whether they would or would not like the Poolbeg chimneys to stay as a landmark of Dublin?

FOI00949

Status Part-Granted
Date received 05 Aug 2025
Date of decision 26 Aug 2025
Category of requester Business / Interest Group
Details of request

I request a copy of the following non-personal records, relating to connection applied under planning ref no: D17A/0240, D20A/0432, or D21A/0161 Thornhill Oaks, Cherrygarth, Mount Merrion, BlackRock, co. Dublin:

•(1) all plans, calculations, and specifications referenced to connection application form NC1 submitted by or on behalf of Oakview Property Developments ltd

•(2) all supporting documentation justifying the maximum import capacity (mic)

•(3) all load demands (KW) including but not limited: EV charge points, large loads, etc.

•(4) connection application form NC1 without personal data.

FOI00947

Status Refused
Date received 01 Aug 2025
Date of decision 07 Aug 2025
Category of requester Client
Details of request
I would be much obliged, if under the Freedom of Information Acts, and any/all other relevant legislation, you could email 1me the relevant documentation towards understanding what is intended regarding parking at e-car esb charging stations, including any guidelines, who has authority, who has the obligation to ensure that they are to be marked (e.g. some seem to be marked for e-cars, some are unmarked and freely available to the public to park legally in them prohibiting access by electric cars).  Any and all material and documentation relevant to this is what I would like you to send me.

FOI00944

Status Refused
Date received 25 Jul 2025
Date of decision 20 Aug 2025
Category of requester Journalist
Details of request

a. Copies of the submissions made by ESB Networks to the Department of Housing on/or dated 25 March 2025 that relate to proposed planning exemptions for backyard cabins, house extensions, and so on.

FOI00940

Status Part-Granted
Date received 16 Jul 2025
Date of decision 19 Aug 2025
Category of requester Client
Details of request
I am writing to request any and all records relating to the 399V power surge to my home which occurred on March 12th 2024. I want to know what caused the surge, why your internal controls failed to prevent it, what level of investigation has been done, who conducted that and what corrective action has been taken to ensure that such a surge can not happen again. I also want to know how many residences were impacted by the surge, what level of damage was caused to persons, premises or appliances, how much collective compensation was proffered and if any liability for future damage to appliances likely to be related to the surge has been accepted.

FOI00939

Status Withdrawn
Date received 07 Jul 2025
Date of decision 07 Jul 2025
Category of requester Client
Details of request
I'm just looking for information. Ever winter we have prolonged blackouts due to severe storms and I would like to know what procedure is for connecting a standby diesel generator that would be just enough to power main components in the house such as heating, fridge, lighting and cooker. Is there any ESB requirements, any application for connection or is it just electrician that would be needed. Keep in mind this is only a standby generator which cant be used parallel with mains. Looking forward hearing from you.

FOI00937

Status Part-Granted
Date received 02 Jul 2025
Date of decision 07 Jul 2025
Category of requester Journalist
Details of request

1. Correspondence between your chair and the relevant minister in the government department under whose aegis you operate

2. Correspondence between your chief executive and the relevant secretary general in the government department under whose aegis you operate

3. During 2024 and 2025 to date

FOI00935

Status Granted
Date received 28 Jun 2025
Date of decision 23 Jul 2025
Category of requester Client
Details of request

I wish to obtain from ESB Networks the date & time of all  planned and unplanned power outage in our area from Jan 01, 2019 to Jun 28th, 2025. This should be a list of outage date & time, cause of outage, number of households affected during this outage, date & time power was restored, steps ESB Networks took to fix root cause of outage. The area in question is where I live, ***, Pallaskenry, Co Limerick ***. We would expect all dates of from Jan 01, 2019 to June 28, 2025 and the data provided as an Excel spreadsheet.

FOI00934

Status Part-Granted
Date received 26 Jun 2025
Date of decision 18 Jul 2025
Category of requester Client
Details of request

Pursuant to the FOI Act 2014, I am requesting the following records held by ESB Networks DAC:
• Information explaining why a notification informing residents of a power outage on 1st July 2025 and dated 5th March 2025, was delivered to residents on 25th June 2025 (see attached for reference)
• Information on why this power outage cannot be limited to a more reasonable timeframe than 9am to 5pm during a working day, and records of demonstrable evidence that this has been considered
• Statistical records on how power outages (planned and unplanned) in Ardilaun and Carrick Court, Portmarnock, Co. Dublin compare to overall power outages (planned and unplanned) in the rest of Portmarnock and the Fingal area
• Records relating to the role of Malahide Golf Club in these planned and unplanned power outages, and specifically records relating to their management of trees that continue to pose a threat to ESB Network overhead lines.
Further, any correspondence which specifically addresses ESB Networks and/or Fingal County Council correspondence about same [noting I am a former FOI officer with detailed knowledge of third party consultation requirements under the Act and those provisions that allow an FOI body to claim exemptions to releasing this information]