FOI Disclosure Logs
FOI01066
Details of request
FOI01064
Details of request
- the number of incidents reported involving drones coming into contact with, or becoming entangled in, overhead power lines or other ESB infrastructure in the period 2023 to 2025.
- the location at county level of such incidents.
- any narrative note on the nature of the incident e.g. entanglement, collision, near miss, etc.
- any note of what action was taken in response, including callouts or recovery operations.
- any records of costs associated with such incidents, where available.
FOI01061
Details of request
FOI01059
Details of request
FOI01057
Details of request
I am writing to request clarification on ESB’s current policy regarding the use of workplace toilet and changing facilities.
Following recent media coverage, I would appreciate it if you could outline:
• ESB’s policy framework for access to single sex and gender neutral facilities
• How ESB ensures that the needs, comfort and safety of all employees are considered
• Whether ESB has a formal policy relating to gender identity in the context of workplace facilities
• Any guidance or procedures in place for staff or managers on this topic
I would also be grateful if you could clarify how ESB’s approach aligns with existing Irish legislation that refers to the provision of single sex facilities, including:
• The Employment Equality Acts
• The Equal Status Acts
• Relevant workplace welfare and health and safety regulations
FOI01053
Details of request
FOI01050
Details of request
1. Any internal reports, briefing notes, or analysis (from 2020 to present) assessing the impact of population growth and/or migration on electricity demand in Ireland.
2. Forecasts or projections of electricity demand that explicitly incorporate population or migration assumptions.
FOI01049
Details of request
1. A register or listing of all distribution-connected generators (MIC/MEC holders) with a fuel type or technology classification of biomass, biogas, anaerobic digestion, biomass CHP, or bioenergy, including projects that are: - Currently connected and generating - Contracted but not yet connected - Where connection offers have been issued but not accepted, or have expired
2. For each such generator, I request the following fields to the extent they are held: - Generator/project name - Connection reference number - Location (townland, county, and/or connected substation) - Maximum Export Capacity (MEC) in MW - Technology/fuel type - Date of connection offer - Date of connection agreement (if signed) - Current connection status (connected / contracted / offer expired / withdrawn) - Whether the generator holds or held a REFIT support contract
3. Any records showing generators that were contracted under REFIT III (biomass CHP, biomass combustion, or anaerobic digestion categories) where the connection offer or agreement has since lapsed, been surrendered, or remains unexercised.
FOI01048
Details of request
FOI01047
Details of request
1. The full legal name and CRO number of the entity (SPV) that ESB Networks:
• entered into the Connection Agreement with,
• issued the Commissioning.
Certificate to, and
• energised for the purposes of exporting electricity to the grid.
2. A copy of the Connection Agreement for Garracummer Wind Farm, including any amendments or successor agreements.
3. A copy of the Commissioning Certificate issued for Garracummer Wind Farm.
4. A copy of the Safety Responsibility Agreement (or equivalent document) identifying the legal entity responsible for operational safety at the point of connection.
5. The MPRN(s) associated with Garracummer Wind Farm.
6. The date of energisation and confirmation of the legal entity in whose name energisation was carried out.
FOI01045
Details of request
- any incident reports, post-incident reviews, root cause analyses, or similar such records relating to a glitch that saw incorrect electricity usage readings being issued to customers.
- any internal reports or briefing documents prepared for senior management or the board relating to the issue.
- any correspondence between ESB Networks and the Commission for Regulation of Utilities (CRU) relating to the issue.
- a record/spreadsheet/database indicating the number of customers affected by the issue.
FOI01043
Details of request
I wish to apply to you under the provisions of the Freedom of Information Act 2014 for thefollowing details in relation to Cahermurphy Windfarms Ltd., Mid Clare Renewable EnergyLtd. and Mid Clare Renewable Energy DAC of Cahermurphy, Kilmihil, Co. Clare.
1. A copy of all details in relation to Standard Connection Agreements Numbers *** and *** between ESB Networks DAC and these three companies.
2. A copy of all correspondence between ESB Networks DAC and these three companies.
3. All copy of all details including internal memos, reports, assessments, emails and phone records in relation to how ESB Networks DAC satisfied itself that appropriate environmental and planning consents are in place for the part underground, part overground, existing grid connection between Cahermurphy windfarm sub-station and the Booltiagh receiving sub-station.
4. A copy of all details including internal memos, reports, assessments, emails and phone records in relation to how ESB Networks DAC satisfied itself that appropriate environmental and planning consents are in place for the proposed replacement underground grid connection across private lands and public road between Cahermurphy windfarm sub-station and the Booltiagh receiving sub-station.
5. A copy of all details including internal memos, reports, assessments, emails and phone records in relation to any queries which ESB Networks DAC made of the above companies as to why the only grid connection route assessed in EIA and AA was not used to connect to the Booltiagh sub-station as proposed in the planning application (and ABP/ACP appeal) for this windfarm development.
FOI01042
Details of request
FOI01037
Details of request
Under the Freedom of Information Act 2014, Requester is asking for access to records held by ESB Networks relating to substations and associated datasets.
1. Structured data fields (all substations)Please provide a complete list of all structured data attributes held by ESB Networks in relation to substations.
For the purposes of this request, structured data refers to any data stored in a database, spreadsheet, GIS system, or other structured system under defined field names or headings.This may include fields used to describe substations in any way, including but not limited to:
•Substation name and/or identifier
•Substation type (e.g. pole-mounted, kiosk, indoor)
•Transformer rating (kVA / MVA)•Number of transformers at site
•Voltage levels (e.g. 38kV / 20kV / 10kV / 400V)•LV configuration (including single-phase or three-phase where recorded)
•Parent or upstream station
•Number of connected customers (where recorded)
•Predominant connection type breakdown (single-phase / three-phase, where recorded)
2. All available data attributes for the following substations:
•MV/LV Substation SO***080X
•MV/LV Substation IL***124X3.
Total number of substations in Ireland
Please provide the current total number of active substations in Ireland.
FOI01038
Details of request
FOI01039
Details of request
FOI01036
Details of request
FOI01035
Details of request
Request Details:
1.Technical Policy & Standards: All internal technical standards, guidance notes, or safety protocols issued to technicians between 2022 and 2026 regarding the installation of Smart Meters and 7kW EV chargers specifically on legacy 8kVA (35-Amp) looped services.
2.Risk Assessment Records: Any internal reviews, safety briefings, or "Lessons Learned" documents concerning thermal failures, fire risks, or fuse-coordination issues (e.g., 52A fuses on 35A-rated cable) in shared/looped services following EV charger upgrades.
3.Prioritisation Protocols: ESB Networks' formal policy or internal management memos regarding the prioritisation of third-party civil works (e.g., neighbour's driveway reinstatement) versus the statutory duty to rectify documented fire hazards at residential properties.
4.Statutory Powers Guidance: Internal guidance provided to Area Managers regarding the exercise of Statutory Rights of Entry under the Electricity (Supply) Acts to rectify hazardous connections when a third party refuses access.
FOI01032
Details of request
FOI01033
Details of request
Technical logs from the day of the fire (11 Nov 2024) and all internal emails regarding the 15-month delay.
All call recordings related to this case and internal dispute/escalation logs from the Dublin North Area Manager’s office throughout 2025.
Technical 'Job Notes' & Site Reports: All field-service notes from the 2023 Smart Meter and meter tail upgrades, specifically any record of the loop/8kVA constraint being checked.
Photographic Evidence: Any photos taken by technicians of my meter cabinet, service fuse, or internal tails during site visits in 2023, Nov 2024, and any subsequent management inspections.
Technical Test Reports: Mr Alan Page’s email mentions that a "number of tests" were done on the property. We require the full data, dates, and official results of every test performed on the assets at our property to date.
Forensic Fire Analysis: Any internal report or email discussion attempting to classify the fire as an "overload" vs. a "loose connection."
Neighbourhood Asset Map: A copy of the network map for my street showing the "looped" connections.