FOI Disclosure Logs

FOI00920

Status Part-Granted
Date received 20 May 2025
Date of decision 09 Jun 2025
Category of requester Client
Details of request

I would like to make a request for Information in respect of the following works which are ongoing at Greenlea Grove Substation, the request is being made under the Freedom of Information Act
•All correspondence relating to the request to have the Cables moved, who requested, why this request was made, who agreed
•All correspondence relating to the works which would be required to complete the work
•All correspondence relating to tenders to contractors and and overall estimate of the cost of the Works
•All correspondence relating to the completion of the works - request for changes which may have been made, where were these changes initiated, agreements
•All correspondence relating to legal title and ownership
•Overall costs of the all the associated works summarised into a total cost
•All correspondence relating to the 5M distance between a Residential property and a substation pertaining to the structure at this location

FOI00914

Status Refused
Date received 14 May 2025
Date of decision 19 May 2025
Category of requester Client
Details of request

Id like to ask you what kind of insurance do your drivers have the drivers that take their company trucks home with them after work is over. Are they insured for travelling to and from work or are trucks insured for social domestic and pleasure purposes?

FOI00916

Status Part-Granted
Date received 13 May 2025
Date of decision 04 Jun 2025
Category of requester Client
Details of request

I am seeking access to any and all records held by ESB Networks relating to the ESB pylon and any equipment or apparatus attached to it, located on or adjacent to Folio *** in the Beechwood estate, Clarecastle, Co. Clare.Specifically, I am requesting:
1.Wayleave agreements, servitudes, or any legal documentation permitting the presence of the pylon and attached equipment.
2.Planning, design, or infrastructure agreements between ESB Networks and the developer or any third party regarding the installation or maintenance of the pylon and associated equipment.
3.Correspondence between ESB Networks and the housing developer and/or Clare County Council concerning the pylon’s installation, ownership, necessity, and ongoing management.
4.Risk assessments, engineering reports, or safety evaluations relating to the presence of the pylon and its attached equipment in close proximity to residential dwellings.
5.Any decommissioning, relocation, or upgrade plans for the pylon and attached equipment currently under consideration or previously discussed.
6.Scientific, technical, or public health documents or studies commissioned, held, or referred to by ESB Networks regarding electromagnetic fields (EMF), radiofrequency radiation, or any other emissions from this infrastructure and attached equipment, especially in relation to close proximity residential exposure.

FOI00910

Status Refused
Date received 08 May 2025
Date of decision 22 May 2025
Category of requester Client
Details of request

In relation to the level of power ESB charge sites are using and are impacting the local grid in Galway city, please provide the amount of power in KWH units of each of the following ESB car charging sites in Galway city in 2024:
1.Galway Retail Park, C6VJ22.
Woodquay, Galway C8FPH3.
Dyke Road, C8QBO4.
Circle K, Newcastle Road, C5FCF5.
Glynn's service station, Oranmore CGG5K6.
Glynn's service station, Oranmore C6GC4

Furthermore, please provide the total annual charge value of
1. the capacity charges
2. the standing charges levied on ESB ecars for each of the six sites above and provide the euro value of each charge for each site.

FOI00907

Status Refused
Date received 29 Apr 2025
Date of decision 15 May 2025
Category of requester Journalist
Details of request

A rcord/spreadsheet/database of all costs incurred by ESB Networks in the provision of transport, accommodation, food, subsistence or other costs to overseas electrical staff who worked in the aftermath of Storm Éowyn. This record to be provided line-by-line or in as much detail as possible as provided for under Section 17(4) of the FOI Act.

FOI00906

Status Refused
Date received 25 Apr 2025
Date of decision 15 May 2025
Category of requester Client
Details of request
  1. Internal communications (including emails, meeting minutes, memos or draft documents) concerning the use of female-only facilities (e.g. showers, changing rooms) by individuals who identify as transgender.
  2. Any complaints, concerns, or submissions raised by female staff regarding discomfort or objections to the use of these facilities by individuals who are biologically male.
  3. Records of decisions, directives or guidance issued by ESB senior management or the Board relating to this issue, including any communication explaining the reasoning behind such decisions.
  4. Correspondence with third parties (including government departments, advocacy groups, or equality bodies) in relation to ESB’s gender identity policy and its application in sex-specific spaces.

FOI00905

Status Granted
Date received 22 Apr 2025
Date of decision 15 May 2025
Category of requester Business / Interest Group
Details of request
(1) How many NC6 certificates were submitted to ESBN between 1 November 2024 and 1 April 2025?
(2) How many of these certificates were for rooftop solar installations?

FOI00903

Status Granted
Date received 18 Apr 2025
Date of decision 30 Apr 2025
Category of requester Client
Details of request
1. A table showing the number of power cuts across the country showing location , duration and number of power cuts in 2023 and 2024
2. The number of power cuts affecting Milford, Donegal in 2023 and 2024

FOI00902

Status Refused
Date received 14 Apr 2025
Date of decision 08 May 2025
Category of requester Client
Details of request
Statement of low usage

FOI00899

Status Refused
Date received 07 Apr 2025
Date of decision 09 Apr 2025
Category of requester Journalist
Details of request
A copy of the ESB board meetings minutes from 01/01/2024 to date.