FOI Disclosure Logs

FOI01080

Status Part-Granted
Date received 26 May 2029
Date of decision 19 Jun 2026
Category of requester Journalist
Details of request
1. Correspondence between your chair, or equivalent, and the relevant minister in thegovernment department under whose aegis you operate.
 2. Correspondence between your chief executive, or equivalent, and the relevant secretarygeneral in the government department under whose aegis you operate.
 3. From 01 July 2025 to date.

FOI01153

Status Granted
Date received 30 Sep 2026
Date of decision 19 Oct 2026
Category of requester Client
Details of request

The document states that the Julianstown station is being uprated from 2 × 5 MVA to 2 × 10 MVA, as part of a programme including system improvements intended to enhance continuity of supply to existing customers.

Could you please clarify:

1. Whether the Julianstown 2 × 5 MVA to 2 × 10 MVA upgrade is intended to improve the continuity/reliability of supply to existing customers, in addition to increasing network capacity.

2. Whether this upgrade affects the network supplying MPRN ***. Whether the Julianstown upgrade is related to any of the recurring faults shown in the outage data provided to me, particularly those associated with the Julianstown/Gormanston network.

FOI01154

Status Granted
Date received 29 Sep 2026
Date of decision 27 Oct 2026
Category of requester Client
Details of request

Request for the following information regarding the electricity network infrastructure serving Dunfirth, Co. Kildare:

1.The total number of planned and unplanned power outages/faults recorded on the Dunfirth distribution line/feeder circuit over the last 5 years. [1]

2.The specific date, start time, and restoration duration for each recorded fault or interruption during this period. [1]

3.The recorded cause or categorisation of each fault (e.g., severe weather, equipment failure, vegetation/tree interference, or network capacity constraints). [1]

4.Any relevant reliability statistics or performance metrics for this specific network segment (such as SAIDI/SAIFI data), and confirmation of whether this line is classified as a "poor-performing feeder

FOI01149

Status Granted
Date received 21 Sep 2026
Date of decision 30 Sep 2026
Category of requester Client
Details of request
1. The connection application as received, its receipt date, application or project reference and applicant/contracting entity, together with any subsequent revised application or formal submission.
2. Records showing the current application stage and any decision to accept, return, withdraw, reject, place on hold or otherwise process the application.
3. Any feasibility response, connection offer, quotation, connection agreement, conditions of connection, technical assessment, or formal decision issued to the applicant, including the date and status of each document.
4. Existing records setting out requested import/export capacity and supply voltage, connection-point options, any reinforcement required and the basis on which each was considered or selected.
5. Records of connection and reinforcement cost estimates, cost-allocation decisions, applicant contributions, security or payment requirements, and any changes to such figures as the application progressed.
6. Substantive correspondence and records of meetings between ESB Networks and the applicant or its agents relating to the application status, technical queries, application completeness, connection arrangements, design approval or commercial terms. Please exclude routine appointment logistics and private personal contact details.

FOI01145

Status Granted
Date received 16 Sep 2026
Date of decision 01 Oct 2026
Category of requester Client
Details of request

1. A complete list of all electricity supply outages (planned and unplanned) affecting the Smearla distribution line, and specifically the section serving Eircodes mentioned above for the period 1 January 2019 to present

2. For each outage, please include:   

• Date and time of interruption   

• Duration of the outage   

• Cause or fault type   

• Number of customers affected

3. Outage logs for neighbouring lines within the same Planner Group for the same period, to allow comparison of outage frequency and duration.

FOI01143

Status Part-Granted
Date received 15 Sep 2026
Date of decision 07 Oct 2026
Category of requester Business / Interest Group
Details of request
This request covers all correspondence, web-form submissions, call logs, emails, network technician site notes, and internal communications regarding any third party reported issues or complaints at this address.

FOI01142

Status Part-Granted
Date received 15 Sep 2026
Date of decision 09 Oct 2026
Category of requester Business / Interest Group
Details of request
For the period 1 January 2024 to 31 December 2025, a request for the following information, where held by ESB Networks:
1. The total quantity of electricity exported to the electricity distribution network by microgeneration customers, in MWh.
2. The total value (€) of payments associated with this exported electricity, where this information is held by ESB Networks.
3. The total quantity of exported electricity recorded during the 17:00–19:00 peak period, broken down by month.
4. Specifically, for the winter months of November, December, January and February, the total quantity of microgeneration electricity exported during the 17:00–19:00 period, preferably for each month separately.
5. Where available, please provide the aggregate export data at 30-minute intervals, showing the total/average electricity exported during each half-hour period of the day.
6. Where the data permits, please distinguish between actual smart-meter export readings and deemed export quantities.
7. Where available, please distinguish solar PV generation/export from other forms of microgeneration.
Requester is particularly interested in understanding the timing of microgeneration electricity exports in relation to Ireland’s evening electricity demand peak. ESB Networks’ published information indicates that smart meter’s record electricity exported to the grid at 30-minute intervals, and identifies 17:00–19:00 as the Peak Period. Requesting aggregated statistical information only and am not seeking any personal information, individual customer information, MPRNs, addresses or any information that could identify individual customers

FOI01138

Status Refused
Date received 04 Sep 2026
Date of decision 30 Sep 2026
Category of requester Client
Details of request

This request relates to the methodology, thresholds, and assessment criteria ESB Networks uses to determine whether electricity consumption is considered "low consumption" for the purposes of the Vacant Property Refurbishment Grant.

FOI01130

Status Granted
Date received 25 Aug 2026
Date of decision 10 Sep 2026
Category of requester Journalist
Details of request

Could you provide document/s detailing the requests Kerry County Council have submitted to ESB in relation to public lighting maintenance from the introduction of the new reporting system on 16/12/25 up till the 31/07/26?


Could these document/s describe nature of the requests and whether the request was completed or cancelled? If a request was cancelled, could a reason be given for the cancellation.

FOI01129

Status Part-Granted
Date received 21 Aug 2026
Date of decision 17 Sep 2026
Category of requester Business / Interest Group
Details of request

I am writing to ask when the latest version of the 38kV and 110kV Station Special Load Readings report, covering all substations and transformers, is expected to be made publicly available.

I understand that the current ESB Networks capacity information references Special Load Readings from 2024/2025, while the latest full report currently available publicly appears to be the 2022/2023 version.

Could you please confirm:

● Whether a 2024/2025 Special Load Readings report has been completed;

● When you expect the full report/data covering all substations and transformers to be published; and

● Whether it is possible to obtain a copy of the latest dataset in advance of its public release.

FOI01125

Status Part-Granted
Date received 19 Aug 2026
Date of decision 15 Sep 2026
Category of requester Journalist
Details of request

1. A copy of any completed audits carried out by your audit team [or commissioned to be carried out by an external auditor] since 1 March 2026;

2. A copy of the minutes of any audit and risk committee [or if separate both the Audit and Risk committees] meetings since 1 March 2026;

3. The most recent periodic update review, report, or briefing in 2026 to date on matters of strategic or operational significance [under ESBN's role and operations as the licensed Distribution System Operator (DSO)] requested by or sent to senior management, the board, the chair, or overseeing body (where there is departmental or ministerial oversight or oversight from another State body).

FOI01122

Status Part-Granted
Date received 17 Aug 2026
Date of decision 14 Sep 2026
Category of requester Journalist
Details of request

• All programme reviews, planning documents, status updates, timelines, and other documents related to the construction and delivery of the following substations:

o Walterstown 110kv/38 kv/MV

o Courtlough 110kv/38 kv/MV

o Batter Lane 110kv/MV

o Blundlestown 110kv/38 kv

o Dunsink 110kv/MV

o Belmayne 110kv/38 kv/MV

o Broadstone 110kv

I'm looking in particular for documents published this year ie since January 1, 2026.

FOI01120

Status Refused
Date received 10 Aug 2026
Date of decision 11 Aug 2026
Category of requester Client
Details of request

details of scheduled works to be carried out by esb resulting in "an extensive timber cutting program in your area customers may experience 2 or 3 planned outages over next few weeks.

Please provide information of what timber cutting programme is planned in our area .

FOI01114

Status Refused
Date received 04 Aug 2026
Date of decision 01 Sep 2026
Category of requester Client
Details of request

Under the Freedom of Information Act 2014, I request access to statistical records and aggregate data held by ESB Networks DAC regarding legacy low-voltage infrastructure management, safety compliance, and thermal asset failures.

Specifically, I request the following anonymized statistical datasets and high-level project metrics compiled from 1st January 2018 up to August 2026 inclusive:

1. National Database Figures: The total number of residential properties across the State currently identified by ESB Networks as being supplied via a legacy shared/looped low-voltage service cable arrangement.

2. National Breakdown: A complete statistical breakdown of these identified looped services by county and operational region across Ireland.

3. Looped Service Overheating & Ignition Counts: The total number of recorded structural fires, meter box ignitions, or localized asset failures occurring at residential properties nationwide where the supply asset was classified as a shared legacy looped service configuration. To ensure comprehensive retrieval, this must include all incidents logged under internal classifications such as: "thermal failure," "service cable breakdown," "equipment failure," "neutral fault," "charring," "melting," or "flashover." [2]

4. EV Charger Correlation Data: Of the total properties identified under Item 3 (looped service incidents nationally), the exact number of those properties that had an active connection notification log or safety sign-off for a domestic 7kW EV (Electric Vehicle) charger or heat pump system on the line prior to the incident.

5. Identification Project Metrics: Any statistical update sheets, program dashboards, or high-level status reports generated between 2024 and 2026 under ESB Networks' internal "Looped Services Identification Project" (which utilizes automated data/AI scans following Smart Meter rollouts).

6. Active Queue Backlog: The total number of residential properties nationwide currently sitting in the active queue or regional backlogs awaiting a planned or emergency "unlooping" separation modification as of August 2026.

FOI01116

Status Refused
Date received 04 Aug 2026
Date of decision 01 Sep 2026
Category of requester Client
Details of request

1. General Technical Safety Standards & Metrics (Date Range: 1st January 2023 to Present)I request copies of any technical safety evaluations, threshold metrics, risk assessments, or "Lessons Learned" reports held by ESB Networks regarding the deployment of modern 7kW Electric Vehicle (EV) charger loads over legacy 1983-era 35-Amp shared service wires / 8kVA residential looped lines.• Note: This item specifically excludes proprietary commercial code or critical national grid infrastructure vulnerabilities. It seeks only general technical safety parameters.

2. MPRN Connection File Logs & Correspondence (Date Range: 1st January 2025 to Present)I request all regional operational correspondence, emails, memos, and log entries held on the ESB Networks customer/infrastructure file for the specific property connected to MPRN: ***• The scope of this item should specifically capture records where safety-rectification works at this address were logged, postponed, or balanced against third-party civil considerations (such as neighboring property access or driveways).

3. Distribution System Operator (DSO) Safety Protocols (Date Range: 1st January 2021 to Present)I request copies of any operational guidance, communication protocols, or risk management pathways provided by ESB Networks DAC to Area Managers concerning how to manage network hazards or safety rectifications when statutory or physical third-party property access is denied.

FOI01117

Status Granted
Date received 04 Aug 2026
Date of decision 13 Aug 2026
Category of requester Journalist
Details of request

- The number of power outages which occured in the Clondalkin area between 01/01/2024 to 01/06/2026.

- The cause of these power outages.

- The length of time before power was restored for each outage.

FOI01112

Status Granted
Date received 27 Jul 2026
Date of decision 11 Aug 2026
Category of requester Client
Details of request

1. I am seeking records relating to potential upgrades of the Glenlara substation in Curraduff, Newmarket Co. Cork.

2. I am seeking records and any communications on file in relation to the Glenlara Power Reserve project - developer Neoen Renewables Ireland Limited. In terms of grid connections or any other developments.

FOI01111

Status Part-Granted
Date received 24 Jul 2026
Date of decision 19 Aug 2026
Category of requester Business / Interest Group
Details of request

Without limiting the scope of this request, I specifically request the following:

1.All historic meter readings held by ESB Networks for my MPRN from the earliest date available, including validated, unvalidated and estimated readings, smart meter data, corrections, amendments and any audit trail showing changes to those readings.

2.All engineering, technical and operational records relating to the Day meter installed at my premises, including fault reports, inspection reports, testing records, engineering notes, technical assessments, replacement decisions and recommendations.

3.All records identifying, discussing or confirming that the Day meter was faulty, unreliable, inaccurate or otherwise unsuitable for billing purposes.

4.All records relating to any determination that charges should not be based upon the Day meter, including the reasons for that determination.

5.All records relating to the discovery that the Day and Night meter readings had been transposed (switched), including:

- when the issue was identified;ohow it was identified;

- who identified it;

- corrective action taken;

- changes made to metering data; and

- notifications issued to electricity suppliers.

6.Copies of all communications between ESB Networks and Flogas, SSE Airtricity and Energia concerning:

- my MPRN;

- meter readings;

- faulty meters;

- corrected readings;

- billing data;

- smart meter installation;

- investigations; and

- customer account information.

7.Copies of every meter reading, correction, amendment or notification transmitted by ESB Networks to Flogas, SSE Airtricity and Energia in respect of my MPRN.

8.All internal ESB Networks records relating to my MPRN, including emails, CRM notes, customer service records, file notes, engineering notes, investigation files, call records, database entries, audit logs and any internal communications retained by ESB Networks.

9.All records relating to the installation and commissioning of the smart meter at my premises, including work orders, installation reports, commissioning records, engineer observations, testing records and completion documentation.

10.All records relating to any investigation into a possible mix-up of customer accounts, MPRNs, meter readings or customer information relating to my electricity supply, including any records referring to Pianos Plus Ltd and Tanme.

11.Records of any telephone conversations or customer service interactions between ESB Networks and me, inclu

FOI01110

Status Part-Granted
Date received 23 Jul 2026
Date of decision 29 Jul 2026
Category of requester Client
Details of request

I would like to request a list of all power outages for the ten year period 23/07/2016 to 23/07/2026 for the Waterside estate, Malahide, Co. Dublin.  Please use my Eircode of the reference if required - ***.

FOI01108

Status Part-Granted
Date received 21 Jul 2026
Date of decision 29 Jul 2026
Category of requester Business / Interest Group
Details of request

I am seeking a copy of all interactions relating to this reference number: ***. Originally logged by my colleague *** on 14th November. Mary has since left the organisation, and I have taken over from her. My contact number is ***.