FOI Disclosure Logs
FOI00961
Details of request
I note an article on Irish Independents website by Paul Deering from the Sligo Champion dated 22nd August which confirms ESB networks plans for "timber and vegetation surveying and clearing works are scheduled to take place in identified areas over the coming months".
I kindly request the scoping document that was issued to ESB contractors for this project, in particular any documentation that identifies the clearance distance is being implemented between existing ESB lines and forestry plantations.
FOI00946
Details of request
FOI00960
Details of request
FOI00957
Details of request
You might provide to me a list of Insurance companies that ESB/ESB Networks uses.
If you cannot process this request, please forward to me the relevant forms required to request this information.FOI00953
Details of request
1. Grid Connection Applications & Agreements
Any applications submitted for grid connection for the ***
Connection offer letters, agreements, and related correspondence.
Internal memos or reports on grid capacity, feasibility, network impacts, or potential curtailment.
2. Technical Studies & Assessments
Feasibility studies, grid impact studies, network analyses, or technical evaluations involving the project.
Internal memos or reports on electrical safety, *** integration, or emergency mitigation.
3. Correspondence and Engagement
Emails, letters, or meeting notes between ESB Networks and the project developer (***) or their representatives.
Correspondence between ESB Networks and ****l, or other statutory bodies regarding the project.
Internal discussions or advice relating to future phases, ***/fire safety, or cumulative impacts on the electricity network.
4. Geospatial and Mapping Data
Any maps, GIS data, or spatial analyses showing the project area in relation to network routes, substations, or electrical infrastructure. Records showing potential constraints, overlays, or mitigation measures relevant to the project’s connection to the grid.
FOI00952
Details of request
This is a request for access to records under Section 12(1) of the Freedom of Information Act 2014.We request copies of any and all records held by you — including reports, plans, projections, correspondence, internal memoranda, maps, and capacity studies — relating to:
1. The number of 220kV substations planned or projected to be built in the Southwest region over the next 40 years.
2. The number of 110kV substations planned or projected for the Southwest region over the next40 years.
3. The number of 38/40kV substations planned or projected for the Southwest region over the next 40 years.
4. The rationale for proposing a 220kV substation at Ballysallagh given its proximity to Knockraha substation, including any capacity assessments, cost-benefit analysis, oroperational need studies.
5. How Ballysallagh 220kV substation would integrate with the national grid, including assessments of forecast demand, industrial development, or strategic network planning.
6. Planned or projected overhead lines or underground services from Ballysallagh 220kV station over the next 40 years.FOI00950
Details of request
1. What is the E.S.B.'s or by extension the Irish Government's current policy regarding the Poolbeg chimneys?
2. Though not particularly old, they have become an iconic landmark in Dublin. Are the chimneys regularly attended to, as in cared for, looked after, painted etc. beyond mere health and safety considerations by whom and how often?
3. If the Poolbeg chimneys are not being regularly attended to, is it the E.S.B 's / Government's policy to let them fall into disrepair until they will have to be taken down, or crumble down?
4. Are there any plans to keep and preserve Poolbeg now or in the pipeline. If so what are the plans?
5. How much is the Poolbeg site costing the tax payer annually to sit there unused commercially or even culturally?
6. Is Poolbeg, i e. the land where the chimneys are located which belongs to the state, currently up for tender to potential buyers? If so at what current price and what official offers to purchase have been received, who are they and what are their plans for the site?
7. Can you quantify how many people have contacted the E.S.B. / Government by letter, e-mail, fax, text, in person etc requesting or petitioning for the chimneys to remain and be refurbished and to stay on the Dublin skyline?
8. Finally do the E.S.B. or Government have any intention now or at some later time, to ask the citizens of Dublin whether they would or would not like the Poolbeg chimneys to stay as a landmark of Dublin?FOI00949
Details of request
I request a copy of the following non-personal records, relating to connection applied under planning ref no: D17A/0240, D20A/0432, or D21A/0161 Thornhill Oaks, Cherrygarth, Mount Merrion, BlackRock, co. Dublin:
•(1) all plans, calculations, and specifications referenced to connection application form NC1 submitted by or on behalf of Oakview Property Developments ltd
•(2) all supporting documentation justifying the maximum import capacity (mic)
•(3) all load demands (KW) including but not limited: EV charge points, large loads, etc.
•(4) connection application form NC1 without personal data.FOI00947
Details of request
FOI00944
Details of request
a. Copies of the submissions made by ESB Networks to the Department of Housing on/or dated 25 March 2025 that relate to proposed planning exemptions for backyard cabins, house extensions, and so on.
FOI00940
Details of request
FOI00939
Details of request
FOI00937
Details of request
1. Correspondence between your chair and the relevant minister in the government department under whose aegis you operate
2. Correspondence between your chief executive and the relevant secretary general in the government department under whose aegis you operate
3. During 2024 and 2025 to date
FOI00935
Details of request
I wish to obtain from ESB Networks the date & time of all planned and unplanned power outage in our area from Jan 01, 2019 to Jun 28th, 2025. This should be a list of outage date & time, cause of outage, number of households affected during this outage, date & time power was restored, steps ESB Networks took to fix root cause of outage. The area in question is where I live, ***, Pallaskenry, Co Limerick ***. We would expect all dates of from Jan 01, 2019 to June 28, 2025 and the data provided as an Excel spreadsheet.
FOI00934
Details of request
Pursuant to the FOI Act 2014, I am requesting the following records held by ESB Networks DAC:
• Information explaining why a notification informing residents of a power outage on 1st July 2025 and dated 5th March 2025, was delivered to residents on 25th June 2025 (see attached for reference)
• Information on why this power outage cannot be limited to a more reasonable timeframe than 9am to 5pm during a working day, and records of demonstrable evidence that this has been considered
• Statistical records on how power outages (planned and unplanned) in Ardilaun and Carrick Court, Portmarnock, Co. Dublin compare to overall power outages (planned and unplanned) in the rest of Portmarnock and the Fingal area
• Records relating to the role of Malahide Golf Club in these planned and unplanned power outages, and specifically records relating to their management of trees that continue to pose a threat to ESB Network overhead lines.
Further, any correspondence which specifically addresses ESB Networks and/or Fingal County Council correspondence about same [noting I am a former FOI officer with detailed knowledge of third party consultation requirements under the Act and those provisions that allow an FOI body to claim exemptions to releasing this information]
FOI00933
Details of request
We moved into our home in Feb 2023. Our understanding is the house was not lived in by the previous owner for 2 years and we would like to apply for the vacant properties grant. I've checked usage using the NPRN number, however, I can only see as far back as Jun 2023. Is it possible for you to share usage from 2020 onwards?
FOI00931
Details of request
In accordance with the Freedom of Information Act 2014, I am requesting:
1.Copies of the scientific or technical studies, reports, or publications that were relied upon when producing or validating the 2017 EMF leaflet;
2.Any more recent internal or public updates, reviews, or revised versions of this EMF information since 2017;
3.Any risk assessments, field measurements, or modelling data held by ESB Networks regarding EMF exposure from 38kV infrastructure, particularly in proximity to residential dwellings;
4.Any internal documentation or policy outlining acceptable separation distances or health-based risk mitigation used in site planning or equipment placement.If no such records exist, I would appreciate written confirmation of that.
FOI00932
Details of request
We initially requested the disconnection of this account in October 2024 and have followed up multiple times since. The disconnection has now finally been completed as of Monday, 26th May 2025.I have just spoken with a member of your customer service team, who advised that I could request a record of the dates and reasons the disconnection was not completed.Could you please provide all relevant notes and updates recorded on your system regarding this account?
FOI00930
Details of request
All records relating to potential utility connections at the site referenced in planning application 2460497 for a large-scale development at the Shackleton Road in Celbridge, Co. Kildare.
I would like the search to cover records from Jan 1st 2025 to date and would like to receive records in soft copy.
FOI00928
Details of request
Would it be possible to find out the connection date for my property ***