If I applied before ECP-1 and my application was deemed complete but not processed, what detail can I change in my application without incurring a new application fee deposit? How should I reflect that I paid an application fee deposit of €7,000?
Can I electronically sign the NC5/NC5A application form?
Do I need to submit a hard copy of the generator application?
If I apply under ECP-2.5 and am successful in the preliminary Batch following the prioritisation criteria as set out in the ECP-2 Decision but subsequently withdraw my application, will my application be backfilled?
If I have an ECP-2.4 application under study and am due to get a connection offer can I apply under the ECP-2.5 Batch?
How will the ECP-2.5 batch be determined?
Who has the authority to sign a generator application form?
What Landowner Consent is required to make a generator application?
What Planning Permission is required to make a generator application?
What maps are required with my generator application?
How do I show that I am applying for an extension?
What co-ordinates are required on the application form?
What is the Project Name?
How are the Applicant details checked by DSO?
Which generator application form should I use, NC5 or NC5A?
How can I pay the application fee deposit?
How much is the application fee deposit?
When is the ECP-2.5 application window?