Will I be notified when additional capacity is available in my location?
Is there work in progress to develop additional electricity network capacity in LMEC areas?
Which areas of the Electricity Network have limited capacity availability?
Which Generation Application Schemes does Limited Maximum Export Capacity (LMEC) connection offers currently apply to?
What level of Maximum Export Capacity (MEC) is offered under Limited Maximum Export Capacity (LMEC)?
Are there any additional requirements for an Limited Maximum Export Capacity (LMEC) connection?
Does Limited Maximum Export Capacity (LMEC) affect the size of system I can install under the various schemes?
Why is it necessary to issue Limited Maximum Export Capacity (LMEC) connection offers?
Is Harmonics data a requirement under the Small Scale Generation Scheme?
What is Limited Maximum Export Capacity (LMEC)?
I have an embedded generator used as Backup for emergency supply (Short term paralleling generators) and only connect to the electricity network for short periods. Do I need to declare this on my application, and will this affect my MIC?
I have a MIC change request pending in ESB Networks' system. Can I submit a Small-Scale Generation application while awaiting completion of the MIC change?
I have a MV connection. Can I apply under Small-Scale Generation?
Are G10 Protection Relays mandatory for all Small-Scale Generation installations , or is it required only when the installed inverter capacity is greater than the MEC?
Can I install a system with a Total Installed Inverter Capacity (TIIC) greater than MEC?
Will I get a new meter once my Small Scale Generator is installed?
What are the eligibility criteria to get paid for my export?
Will I get paid for the electricity I export to the electricity network?
How do I register to get paid for my excess electricity?
Can I install a larger Generator?