Are there any additional requirements for an Limited Maximum Export Capacity (LMEC) connection?
Will I get paid for the electricity I export to the electricity network?
Can I install a larger generator?
I am eligible to have a smart meter, but I do not want a smart meter. Can I still get paid for my export?
Will my electricity bill change after the generator is installed?
Can I use my Micro-generator, Mini-generator or Small scale generator during an electricity network power outage?
Do you always need to install a smart meter which records export?
Will I be notified when additional capacity is available in my location?
Is there work in progress to develop additional electricity network capacity in Limited Maximum Export Capacity (LMEC) areas?
Which areas of the Electricity Network have limited capacity availability?
Which Generation Application Schemes does LMEC connection offers currently apply to?
What level of Maximum Export Capacity (MEC) is offered under Limited Maximum Export Capacity (LMEC)?
Does Limited Maximum Export Capacity (LMEC) affect the size of system I can install under the various schemes?
Why is it necessary to issue Limited Maximum Export Capacity (LMEC) connection offers?
What is Limited Maximum Export Capacity (LMEC)?
I have an embedded generator used as backup for emergency supply (Short term paralleling generators) and only connect to the electricity network for short periods. Do I need to declare this on my application, and will this affect my MIC?
I have a MIC change request pending in ESB Networks' system. Can I submit a Mini-generation application while awaiting completion of the MIC change?
Can I install a system with a Total Installed Inverter Capacity (TIIC) greater than MEC?
I have previously applied to have a Parallel (Non-Exporting) Generator. Can I still apply for Mini-Generation?
Is the grant of final planning permission a requirement before applying to the Mini-generation scheme?