This registration of interest form does not constitute an application for a flexible connection. Before registering your interest in a flexible connection, you must complete either a new connection or an increased MIC application form.
Registering your interest for a flexible connection
does not guarantee you will be offered a flexible connection. Our team will review your new connection or increase in MIC application form alongside the information you provide in this registration form and if deemed appropriate will be in contact
with you to discuss the possibility of a flexible connection.
Section 1: Contact details & application information
Field is requiredWhat is the name of your organisation? valid
Email address is requiredWhat is the email contact for the person registering interest on behalf of the organisation? valid
Field is requiredPlease provide your new connection or increased MIC application reference number. valid
Field is requiredPlease provide the MPRN valid
Section 2: Additional organisation details
In what industry or industries does your organisation operate valid
How many sites does your organisation operate in Ireland? valid
Section 3: Demand profile, current & future
Please describe the demand load on your site currently and over the next 3 years e.g. is the existing load profile peaky or flat? valid
What potential does/would your site have for adjusting this demand if granted a flexible connection. valid
Please outline any onsite generation at the site proposed and if it can be controlled as part of a flexible connection. valid
Section 4: Process & technology readiness
What impact would a sudden reduction in capacity have on your business process valid
Describe any of the technologies or strategies that would be used to manage demand on your site as part of a flexible connection. valid
Please complete the recaptcha to submit the form.
Check the box on the reCAPTCHA above to submit form