What do I do if I am not going ahead with my Micro-gen installation?
What do I do if I am removing or installing more micro-generation?
What data will be collected from my Smart meter?
Do you always need to install a smart meter which records my export?
What is the process for installing Micro-generator in a new build?
Can I connect my Micro-generator to ESB Networks' Low Voltage (LV) system?
Can I use my Micro-generator, Mini-generator or Small scale generator during an electricity network power outage?
What changes have been made to Micro-generation?
What is the cost of connecting a Micro-Generator to the electricity network?
My export quantities seem to differ from the ESB Networks HDF file and what my smart meter shows. Why is this?
I have a smart meter but some days I am provided with deemed export. Why is this?
What happens to the electricity I have exported to the grid prior to my Maximum Export Capacity being updated? Can I get paid for this?
How do I calculate my export values using the deemed export calculation?
How much electricity have I exported back to the grid since the microgeneration support scheme started?
I previously chose not to avail of a smart meter. How do I go about changing my mind?
Why should I notify ESB Networks that I am installing a Micro-Generator?
Where can I find information on qualifying equipment and installers of Micro-generators?
Can I install a larger Generator?
How do I know if I am eligible for a smart meter during this phase of the rollout?
I am eligible to have a smart meter, but I do not want a smart meter. Can I still get paid for my export?