Skip to Content
For emergencies: Call 1800 372 999
What do I do if I am not going ahead with my Micro-gen installation? What do I do if I am removing or installing more micro-generation? What data will be collected from my Smart meter? Do you always need to install a smart meter which records my export? What is the process for installing Micro-generator in a new build? Can I connect my Micro-generator to ESB Networks' Low Voltage (LV) system? Can I use my Micro-generator, Mini-generator or Small scale generator during an electricity network power outage? What changes have been made to Micro-generation? What is the cost of connecting a Micro-Generator to the electricity network? My export quantities seem to differ from the ESB Networks HDF file and what my smart meter shows. Why is this? I have a smart meter but some days I am provided with deemed export. Why is this? What happens to the electricity I have exported to the grid prior to my Maximum Export Capacity being updated? Can I get paid for this? How do I calculate my export values using the deemed export calculation? How much electricity have I exported back to the grid since the microgeneration support scheme started? I previously chose not to avail of a smart meter. How do I go about changing my mind? Why should I notify ESB Networks that I am installing a Micro-Generator? Where can I find information on qualifying equipment and installers of Micro-generators? Can I install a larger Generator? How do I know if I am eligible for a smart meter during this phase of the rollout? I am eligible to have a smart meter, but I do not want a smart meter. Can I still get paid for my export?