PublicationsÂ
Showing 13 results
Planning Drawing for MV EGIP Modular Substation BUILDING DOC-040822-HMT
Planning Drawing for MV EGIP Modular Substation FOUNDATION DOC-040822-HMU
Functional Spec 18152 for the Installation of Ducts and Ancillary Structures for 20kV Underground Power Cables & Associated Communications Cables for Contestable Projects
General Spec 18133 for Contestable Built HV Substations
General Specification Document 18134 for Contestable Built MV Substations Equipped with Embedded Generation Interface Protection (EGIP)
General Spec Document 18149 for Contestable Built Underground Networks
Functional Specification 18150 for the Installation of Ducts and Ancillary Structures for 38KV Underground Power Cables and Associated Communication Cables for Contestable Projects
Functional Specification 18151 for the Installation of 38KV Underground Power Cables for Contestable Projects
Functional Specification 18153 for the Installation of 20KV UG Power Cables for Contestable Projects
Conditions Governing the Connection and Operation of Micro-generation policy | 518 KB