Publications

All Publications

382 KB

2018 Batch (ECP-1) Results - Joint SO Publication July2020

Download PDF

370 KB

2020 Batch (ECP-2.1) Results - Joint SO_Publication_July 2022

Final Results ECP-2.1 Category A Batch.

Download PDF

6 MB

2022 Environmental Performance Report |Download PDF 6.2MB

Download PDF

980 KB

210429 All Island European stakeholder forum slides draft v1.0_final_for_web

The latest All-Island Stakeholder Forum on EU Network Codes took place on 29th April, 2021. Updates were given from the System Operators and Regulators on current topics on Network Codes. The slides from the event are published here.

Download PDF

229 KB

22902 Fallen Electricity Wires

Download PDF

416 KB

300 kVA Pole Mounted Transformer Close-Out Report

As customers adopt more low carbon technologies and there is an increase in the electrification of heat and transport, ESB Networks will see increasing loads on the Low Voltage (LV) network. This report deals with a solution to an issue where the current maximum size of pole mounted transformer (200kVA) becomes overloaded.  The proposed solution is to develop a 300 kVA pole mounted transformer which would have similar dimensions to the existing 200 kVA pole mounted transformer and remain within allowable weight limits for the pole, so that the uprating would now simply require the direct replacement of the 200 kVA unit with one of 300 kVA rating.
Download PDF

14 MB

38kV and 110kV Station Special Load Readings 2022/2023

Special Load Readings (SLR) are a coincident set of measurements of simultaneous load for all distribution substations. The readings are recorded for 4 times annually as follows:

  • Winter: Measure at 12.30 and 18.00 hours on second Thursday in December. If the second Thursday in December is the 8th then the measurements are taken on the following Tuesday, December 13th.
  • Summer Peak: Measured at 12.30 hours on the fourth Thursday in June.
  • Summer Valley: Measured at 06.00 hours on the Sunday preceding the early August Monday Public Holiday.

Download PDF

3 MB

38kV Material Standards

This document provides details of the material required for a 38kV cable installation on the ESB system. It is password protected, if you need access to it please contact james.oshaughnessy1@esb.ie.

Download PDF

55 KB

AA Screening Determination - Ardnacrusha - J 105 221021

Download PDF

58 KB

AA Screening Determination - Brewery Road 140421

Download PDF

49 KB

AA Screening Determination - Caherdaniel 16032021

Download PDF

48 KB

AA Screening Determination - Graiguenamanagh 040621

Download PDF
8 / 45
1
. . .
6 7 8 9 10
. . .
45