Publications
All Publications
1 MB
Quick User Guide: Smart Electric Vehicle Charging with Vehicle to Grid Capability
312 KB
Quick User Guide: Smart Home Energy Management Systems
68 KB
Rate of Change of Frequency Requirments of Users
Modification No. 26 - DS3 Rate of Charge of Frequency Requirements of Users.
Effective Date 09/04/2014
110 KB
Registered Capacity
Modification No. 25 - Registered Capacity.
Effective Date 13/08/2014
807 KB
Request for Expressions of Interest for Partnering with ESB Networks on P2P Energy Trial
ESB Networks is seeking Expressions of Interest from domestic electricity suppliers to become a partner on a Peer-to-Peer Energy trial as part of the Dingle demonstration project. The final date for submission of Expressions of Interest is 3rd July 2020 and ESB Networks intends to have selected its preferred partner by end July, with the trial commencing from September 2020.
Update Please note that the period for the submission of Expressions of Interest is now closed.
1001 KB
Requirements for Generators
Connection requirements for new generators. The detailed requirements currently being developed and transferred into our existing Distribution Code. They will only apply to new generators whose plant procured from May 2018 onwards.
269 KB
Rules for Application of DUoS Tariff Group
This document outlines the rules for applying the correct Distribution Use of System tariff (DUoS Group) to a customer premises or connection point.
6 MB
Safe Construction with Electricity new
318 KB
Safety Competition Top Tips for creating your poster
Safety Competition Top Tips for Creating your Poster.
382 KB
Safety Co-ordination (DOC 11) - Modification No. 38
Modification No 38 Safety Procedures
Effective Date 23/02/2016