Publications

Generator Connections

502 KB

Transmission Connection Agreement Schedule 10_For Contestability of Commissioning Consultation 22.07.16

The purpose of this consultation is to seek views from industry on the joint proposal from EirGrid and ESB Networks to introduce contestability of commissioning for customer connections to the electricity system at transmission and distribution level.

Download PDF

679 KB

Transmission Connection Agreement_For Contestability of Commissioning Consultation 22.07.16

The purpose of this consultation is to seek views from industry on the joint proposal from EirGrid and ESB Networks to introduce contestability of commissioning for customer connections to the electricity system at transmission and distribution level.

Download PDF

547 KB

Windfarm Performance Monitoring Process

This document outlines the process that is adopted by Eirgrid and ESB Networks in monitoring the performance of Wind Farm Power Stations (WFPS)

Download PDF