CONSULTATION
Latest Publication

Expression of Interest for Partnering with ESB Networks on P2P Energy Trial

ESB Networks is seeking Expressions of Interest from domestic electricity suppliers to become a partner on a Peer-to-Peer Energy trial as part of the Dingle demonstration project.  The final date for submission of Expressions of Interest is 3rd July 2020 and ESB Networks intends to have selected its preferred partner by end July, with the trial commencing from September 2020. 

Request for Expressions of Interest for Partnering with ESB Networks on P2P Energy Trial | Download PDF 1 MB

 

document

Demand Connection

Connection requirements for new demand customers who want to participate in demand response services. This document includes the detailed requirements currently being developed and transferred into our existing Distribution Code. They will only apply to new customers whose plant is procured from September 2018 onwards.

Download PDF | 624KB

document

Requirements for Generators

Connection requirements for new generators. The detailed requirements currently being developed and transferred into our existing Distribution Code. They will only apply to new generators whose plant procured from May 2018 onwards.

Download PDF | 1001KB

document

Energy Balancing

The Market Code which addresses balancing market design, operation and settlement. There are some common terms, requirements and interdependencies between this code and System Operation.

Download PDF | 747KB

document

Emergency Restoration

Operational roles and responsibilities under emergency conditions. The detailed requirements are being developed and will be transferred into our existing Distribution Code.

Download PDF | 653KB

document

System Operation

Operational roles and responsibilities for system operators and users under normal conditions. The detailed requirements are being developed and will be transferred into our existing Distribution Code. This code includes outage planning and data exchange.

Download PDF | 1018KB

document

Distribution Code Class Derogation

Download PDF | 37KB

document

Proposal for General Application of RfG Requirements for Ireland

The consultation on the non-exhaustive parameters for the Requirements for Generators [RfG] has now closed. This proposal document is produced jointly by EirGrid plc in its role as the Transmission System Operator in Ireland and ESB Networks in their role as the Distribution System Operator in Ireland. This document contains the proposed parameters and explanations as to the reasons for their adoption, which are now formally submitted to the Commission for Regulation of Utilities [CRU] for approval.  It also contains responses to the consultations and the System Operator replies. 

Download PDF | 3MB

document

DSO Completed Applications list 03.08.2018

DSO Completed Applications list 03.08.2018

Download PDF | 859 kB