document
Latest Publication

ESB Networks Response Paper MV Customer Connection Standard Module – Electric Vehicle Charging Hubs in Urban Environment

This response paper addresses feedback and comments received during our public consultation on MV Customer Connection Standard Module – Electric Vehicle Charging Hubs in Urban Environment.

ESB Networks Response Paper MV Customer Connection Standard Module – Electric Vehicle Charging Hubs in Urban Environment | Download PDF | 512 KB

document

2020 Batch (ECP-2.1) Category B & C Results - Non-Batch and Community-led

Final Results for successful ECP-2.1 Category B and Category C applicants. 

Download PDF | 411 KB

document

2020 Batch (ECP-2.1) Results - Joint SO_Publication_January 2021

Final Results ECP-2 Category A Batch. 

Download PDF | 364 KB

document

38kV & 110kV Station Special Load Readings 2018/2019

38kv & 110kV Station Special Load Readings 2018/2019 | Download PDF 4 MB

Special Load Readings (SLR) are a coincident set of measurements of simultaneous load for all distribution substations. The readings are recorded for 4 times annually as follows:

  • Winter: Measure at 12.30 and 18.00 hours on second Thursday in December. If the second Thursday in December is the 8th then the measurements are taken on the following Tuesday, December 13th.
  • Summer Peak: Measured at 12.30 hours on the fourth Thursday in June.
  • Summer Valley: Measured at 06.00 hours on the Sunday preceding the early August Monday Public Holiday.

38kV & 110kV Station Special Load Readings | Download PDF | 4MB

Special Load readings (SLR) are a coincident set of measurements of simultaneous load for all distribution substations. The readings are recorded for 4 times annually as follows:

  • Winter: Measured at 12.30 and 18.00 hours on the second Thursday in December. If the second Thursday in December is the 8th, then the measurements are taken on the following Tuesday, December 13th.
  • Summer Peak: Measured at 12.30 hours on the fourth Thursday in June. 
  • Summer Valley: Measured at 06.00 hours on the Sunday preceding the early August Monday Public Holiday.38kV & 110kV Station Special Load Readings 2019-2020 | Download PDF | 4MB
document

38kV Material Standards

This document provides details of the material required for a 38kV cable installation on the ESB system. It is password protected, if you need access to it please contact james.oshaughnessy1@esb.ie

Download PDF | 3 MB

Sparky. 86 x 125 final jpg

Activity Sheet Junior 1

Activity Sheet Junior 1

Download PDF | 525 KB

Sparky. 86 x 125 final jpg

Activity Sheet Junior 2

Activity Sheet Junior 2

Download PDF | 180 KB

Sparky. 86 x 125 final jpg

Activity Sheet Senior 1

Activity Sheet Senior 1

Download PDF | 145 KB

Sparky. 86 x 125 final jpg

Activity Sheet Senior 2

Activity Sheet Senior 2  

Download PDF | 155KB

document

All-island Network Code Stakeholder Forum Slideshow

The 8th All-island Network Code Stakeholder Forum took place on the 12th August 2020.This Forum provides information on changes to connection standards, European rules for the electricity market and grid operations, emergency procedures and on other areas of European electricity policy.

All-island Network Code Stakeholder Forum Slideshow | 1 MB