Letter to Silage Contractors - May 2019

This letter identifies the risk associated with coming close to live electricity wires. Very serious electrical accidents have taken place involving silage machinery.

Letter to Silage Contractors | Download pdf

document

Information on Fluid Filled Cables

This document gives information on fluid filled cables, including cable history, first period, second period, plastic period, and replacement period.

Information on Fluid Filled Cables | download pdf 1MB

document

DCRP Minutes 2nd October 2018

Minutes of Distribution Code Review Panel Meeting of 2nd October 2018

Download PDF | 240KB

document

Distribution Capacity Enquiry 2017

This PDF gives a high level review of existing network capacity for connecting large demand.

Download PDF | 269 KB

document

Wind Farm Distribution Code Testing

This document sets out the agreed approach between the TSO and the DSO in relation to Distribution Code Compliance Testing process for controllable wind farm power stations (WFPS) with a registered capacity of 5 MW or more.

Download PDF | 909 KB

document

Connection Policy - Transitional Arrangements Capacity Release - Results

In line with the commission for Energy Regulation (CER)'s Decision Paper - Connection Policy Transitional Arrangements CER/16/284, and as amended by Connection Policy Transitional Arrangements Partial Capacity Release CER/17/090, generation customers were given the opportunity to  apply to ESB Networks to terminate all or part of an eligible Customer's Distribution Connection Agreement.

The deadline for application was 30th June 2017. 

As directed in CER/16/284, we are now publishing the results in relation to the Distribution Capacity Release applications received.

 Download PDF | 216KB

Please see EirGrids website (Link) for details on the Transmission Capacity Release results.

document

Supplemental Application for Modifications to Generation Connection Offers

This application form should be completed if your project is being processed within the group processing approach GPA, and you wish the system operators to use assumed project data rather than specific project data provided by you.

Download PDF | 374 KB

document

Distribution Code Review Panel Members

Distribution Code Review Panel Members

Download PDF | 257 KB

ESB Networks 2027

ESB Networks 2027

This publication sets out our vision of Networks 2027.

Download PDF | 3 MB