Letter to Silage Contractors - May 2019

This letter identifies the risk associated with coming close to live electricity wires. Very serious electrical accidents have taken place involving silage machinery.

Letter to Silage Contractors | Download pdf

document

Information on Fluid Filled Cables

This document gives information on fluid filled cables, including cable history, first period, second period, plastic period, and replacement period.

Information on Fluid Filled Cables | download pdf 1MB

document

DCRP Minutes 2nd October 2018

Minutes of Distribution Code Review Panel Meeting of 2nd October 2018

Download PDF | 240KB

document

Apprenticeship pdf

This pdf contains information about entry requirements for an Electrical/Network Technician Apprenticeship in ESB Networks . It also has details on interview tips and how to apply.

Download pdf | 1 MB

document

Distribution Capacity Enquiry 2017

This PDF gives a high level review of existing network capacity for connecting large demand.

Download PDF | 269 KB

Public Safety Strategy 2017 - 2020  86x125

Public Safety Strategy 2017-2020

Public Safety Strategy and Action Plan 2017-2020.  Educating the public to act safely near electricity.  Download PDF | 2MB

How you can avoid hitting electricty cables 86x125

How you can avoid hitting electrical cables when digging and drilling

This booklet provides guidelines that apply to all work that involves penetrating the ground at or below surface level where there maybe ESB Networks cables or privately owned cables.

Download PDF | 395 KB

Safe Construction with Electricity

This booklet provides important safety and customer service information to help you stay safe when working near electricity networks and to explain key steps when you require services from ESB Networks. 

Download PDF

Sparky 86 x125 DRAFT

Stay Safe, Stay Clear VIDEO

Watch Video

document

Supplemental Application for Modifications to Generation Connection Offers

This application form should be completed if your project is being processed within the group processing approach GPA, and you wish the system operators to use assumed project data rather than specific project data provided by you.

Download PDF | 374 KB