document

2020 Batch (ECP-2.1) Category B & C Results - Non-Batch and Community-led

Final Results for successful ECP-2.1 Category B and Category C applicants. 

Download PDF | 411 KB

document

Interim standard guideline clearances for Solar Farm to DSO overhead network

Interim guideline clearances for Solar Farm to DSO Overhead Network|Download PDF 321 KB

document

Coolnabacky Substation Report

  

The attached Independent comprehensive hydrogeological and hydrological review of the proposed Coolnabackey Substation found the proposed development will not impact on local water sources posing "no significant risk" and corroborating previous studies undertaken. 

Coolnabacky-report-issue-16-2-21 | Download PDF 699 KB

document

ESB Networks Response Paper MV Customer Connection Standard Module – Electric Vehicle Charging Hubs in Urban Environment

This response paper addresses feedback and comments received during our public consultation on MV Customer Connection Standard Module – Electric Vehicle Charging Hubs in Urban Environment.

ESB Networks Response Paper MV Customer Connection Standard Module – Electric Vehicle Charging Hubs in Urban Environment | Download PDF | 512 KB

document

Meter Signals for Customer Energy Management System (EMS)

Meter Signals for Customer Energy Management System | Download pdf 240KB

NT with multi meter in switch rm

ESB Networks Annual Performance Report 2018

The report covers the performance of ESB Networks’ Distribution Business for the year ending December 2018.

Download PDF | 3 MB
document

How Stakeholder Feedback is Shaping our Engagement

This report describes how stakeholder feedback is shaping our approach to our engagement strategy, plans and activities in 2020. It describes how ESB Networks is interpreting stakeholders’ needs and our proposed approach to ensure continuous improvement of our stakeholder engagement going forward. 

How Stakeholder Feedback is Shaping our Engagement | Download PDF | 713 KB
document

ECP-2 Decision CRU/20/060 – Capacity Release DSO Applications

As outlined in Section 2.9 of  the ECP-2 Decision paper, all projects contracted pre ECP-1 (but not those that folded into ECP-1) were given a final opportunity by ESB Networks and Eirgrid to terminate their connection agreement and release their full contracted MEC on the same terms and conditions for capacity release outlined in CER/16/284 (including 80% refund of first stage payment).

Please click the link below to view the full list of DSO Projects who availed of Final Capacity Release:

Download PDF | 125 KB