document

DCRP Minutes 8th December 2017

Minutes of Distribution Code Review Panel Meeting of 8th December 2017

Download pdf | 553KB
document

Proposal for General Application of RfG Requirements for Ireland

The consultation on the non-exhaustive parameters for the Requirements for Generators [RfG] has now closed. This proposal document is produced jointly by EirGrid plc in its role as the Transmission System Operator in Ireland and ESB Networks in their role as the Distribution System Operator in Ireland. This document contains the proposed parameters and explanations as to the reasons for their adoption, which are now formally submitted to the Commission for Regulation of Utilities [CRU] for approval.  It also contains responses to the consultations and the System Operator replies. 

Download PDF | 3MB

document

DCRP Minutes 26th October 2017

Minutes of Distribution Code Review Panel Meeting of 26th October 2017

 

Download PDF | 381 KB

document

System Operation

Operational roles and responsibilities for system operators and users under normal conditions. The detailed requirements are being developed and will be transferred into our existing Distribution Code. This code includes outage planning and data exchange.

Download PDF | 1018KB

document

Emergency Restoration

Operational roles and responsibilities under emergency conditions. The detailed requirements are being developed and will be transferred into our existing Distribution Code.

Download PDF | 653KB

document

Energy Balancing

The Market Code which addresses balancing market design, operation and settlement. There are some common terms, requirements and interdependencies between this code and System Operation.

Download PDF | 747KB

document

Requirements for Generators

Connection requirements for new generators. The detailed requirements currently being developed and transferred into our existing Distribution Code. They will only apply to new generators whose plant procured from May 2018 onwards.

Download PDF | 1001KB

document

Demand Connection

Connection requirements for new demand customers who want to participate in demand response services. This document includes the detailed requirements currently being developed and transferred into our existing Distribution Code. They will only apply to new customers whose plant is procured from September 2018 onwards.

Download PDF | 624KB