Load Demand Data

Special Load Reading Data

Special Load Reading data for 2016-2017 providing demand information on transformers and feeders of 110kV and 38kV substations.  These records have been redacted removing customer names, MPRN, MIC, billing class and MEC.

Special Load Report 2016-17 |418KB

SLR Main Section |1MB

Abnormal Feeding |32KB

HV Export Customer Stations |44KB

HV Demand Customer Stations |46KB 

MV & LV Generators < 25kVA |81KB

    

document

EV Pilot Project Report

Pilot Project Report Summary on Preparing for Electric Vehicle on the Irish Distribution System

EV Pilot Project Report | 1.3MB
document

Modification No. 41- DCRP Class Derogation

The CRU has approved Modification No. 41 of the Distribution Code. The purpose of this Modification is to allow the relevant System Operators or Distribution Code Review Panel to propose class derogations to the CRU, rather than requiring each individual affected party to make a bespoke application.

Effective Date 10/10/2017

Download PDF | 393KB

CRU Approval Letter | 44KB

document

Modification No. 45 - Met Signal Requirements

Proposed to remain aligned with a similar Grid Code modification. The modification is proposed to give WFPS the opportunity to discuss acceptable alternative sources for the provision of met data signals.

Effective Date 06/11/2018

Download PDF | 111KB

CRU Approval Letter | 47KB

document

Modification No. 44 - 1.1 pu Clarification and Adoption of Declared Supply Voltage

The most recent version of EN 50160, introduced the new parameter of “Declared Supply Voltage”. The voltage at the Connection Point shall be kept within +/- 10% of these values. Up to now, these parameters had not been defined.

Effective Date 11/10/2018

 

Download PDF | 347KB

 

CRU Approval Letter | 59KB

document

Electricity Transmission Performance Report 2017

This document is a joint TSO/TAO Report between EirGrid and ESB Networks which looks at our performance in developing, operating and maintaining the transmission system throughout 2017.

 Download PDF | 2MB 
document

Investment Planning and Delivery Report 2017

This document is a joint TSO/TAO Report between EirGrid and ESB Networks which looks at our performance in planning investments and ultimately delivering transmission system projects in 2017.

Download PDF | 4MB

 

 

document

DCRP Minutes 12th July 2019

Minutes of Distribution Code Review Panel Meeting of 12th July 2019

Download PDF | 191KB

document

DCRP Minutes 15th April 2019

Minutes of Distribution Code Review Panel Meeting of 15th April 2019

Download PDF | 173KB