document

Proposal for General Application of DCC Requirements for Ireland

The consultation on the parameters for the Demand Connection Code [DCC] has now closed. This proposal document is produced by ESB Networks in their role as the Distribution System Operator in Ireland.  This document contains the proposed parameters and explanations as to the reasons for their adoption, which are now formally submitted to the Commission for Regulation of Utilities [CRU] for approval.  It also contains responses to the consultation.

Download PDF | 855 KB

document

Proposal for General Application of RfG Requirements for Ireland

The consultation on the non-exhaustive parameters for the Requirements for Generators [RfG] has now closed. This proposal document is produced jointly by EirGrid plc in its role as the Transmission System Operator in Ireland and ESB Networks in their role as the Distribution System Operator in Ireland. This document contains the proposed parameters and explanations as to the reasons for their adoption, which are now formally submitted to the Commission for Regulation of Utilities [CRU] for approval.  It also contains responses to the consultations and the System Operator replies. 

Download PDF | 3MB

CONSULTATION

Public Consultation on the ESB Networks 2018 Annual Performance Report

In line with the CRU Decision ‘Reporting and Incentives under Price Review 4’ (CER/15087), ESB Networks, in its capacity as Distribution System Operator,  today is publishing for consultation the draft, 'ESB Networks 2018 Annual Performance Report', which will cover ESB Networks Distribution Network activities for 2018. The report is intended to provide customers, industry participants and other interested parties with a clear, accessible, comprehensive, but non-technical report on Distribution performance in the calendar year.

ESB Networks Annual Performance Report 2018 | Download PDF | 3 MB

Consultation Question

Do you have any comments on the ESB Networks 2018 Annual Performance Report?

Next Steps

The consultation period will run for four weeks and will close on the 4th  May 2020. When the consultation closes, ESB Networks will review and consider all the comments and publish a final version pending CRU approval.

Interested stakeholder’s views are invited and can be sent to stephen.osullivan@esb.ie

 

Gentleman cutting trees near overhead line

Public Safety Advice from ESB Networks

Stay Safe with electricity.  ESB Networks is reminding all customers to never take risks with electricity.

Download PDF | 109 KB

Public Safety Strategy 2017 - 2020  86x125

Public Safety Strategy 2017-2020

Public Safety Strategy and Action Plan 2017-2020.  Educating the public to act safely near electricity.  Download PDF | 2MB

document

Requirements for Generators

Connection requirements for new generators. The detailed requirements currently being developed and transferred into our existing Distribution Code. They will only apply to new generators whose plant procured from May 2018 onwards.

Download PDF | 1001KB

document

Rules for Application of DUoS Tariff Group

This document outlines the rules for applying the correct Distribution Use of System tariff (DUoS Group) to a customer premises or connection point.

Download PDF | 269 KB