document

MV & LV Cable Installation Drawings

Drawings of MV & LV Cable Installations.

Download PDF | 1 MB

document

MV/LV Installations Standards & Practice Manual

This document provides guidance and standards for MV/LV cable installations on the ESB system. It is password protected, if you need access to it please contact james.oshaughnessy1@esb.ie

 

Download PDF | 6 MB

National Code of Practice

National Code of Practice

This document explains the arrangements that exist at the interface point between the electricity network and customers' equipment for a range of electricity connection situations.

Download PDF | 3 MB

FORM

New Connection or Increased/Reduced Capacity (MIC) Application (NC3)

This Application Form is for business customers wishing to apply for a connection to the electricity distribution system for the following:

  • A single commercial/industrial unit
  • Mixed multiple connections, e.g. traffic lights, bus shelters
  • An increase or decrease in your current level of supply (Maximum Import Capacity)
  • Farm premises that use loads of greater than or equal to 30 Kilovolt-Amperes (kVA).

Download PDF | 272 KB or Apply ONLINE

FORM

New Generator Connection Application (NC5)

This form should be completed by customers who want a new generator connected to the distribution system.

Download PDF | 737 KB

FORM

New Generator Connection Application (NC5A)

This form should be completed by customers who want a new generator connected to the distribution system.

Download PDF | 548 KB

FORM

New or Changed Unmetered Connections Application (includes public lighting) (NC4)

This application form is for customers who wish to apply for a connection to the electricity distribution system for unmetered connections.  See further information below on when to use this Application Form.

  • Unmetered public lighting of less than 2 Kilovolt-Amperes (kVA) for a Local Authority or builder/developer,
  • Unmetered electric loads (not public lighting) of less than 2 Kilovolt-Amperes (kVA) for customers with connection points, e.g. traffic lights, bus shelters,
  • Unmetered electric loads (not public lighting) of less than 2 Kilovolt-Amperes (kVA) for customers with a single connection point, e.g. electric fences.

Download PDF | 111 KB

document

Node Assignments list - Updated 20/05/2011

The System Operators have undertaken to update the node assignments list from time to time to confirm any changes to the Gate 3 tables originally published on the 19th January 2009. Changes are marked in yellow in the document and a footnote is included explaining the high level reason for the change.

Download PDF | 244 KB

Pay As You Go Meter

Pay As You Go Meter

This document will provide you with all the relevant information you need to know about your pay as you go meter.