Contracted Non-Wind Generators

This document contains statistical information on all Contracted Non-Wind Farm generators to the distribution system and is updated every quarter.

Download PDF | 137 KB


Correspondence from ESB Networks with regard to connection methods

This correspondence sets out the deadlines within which connection method suggestions have to be submitted to the System Operators (SO's) to ensure that they can be included in connection method studies.

Download PDF | 154 KB


Details on processing applications outside of GPA.

This document outlines the steps by which an application is processed which is not the normal GPA, it also includes factors that make an eligible non GPA application.

Download PDF | 428 KB


Guidelines for costs and applicability of EGIP (Embedded Generation Interface Protection).

This documents presents Guidelines for costs and applicability of EGIP (Embedded Generation Interface Protection).

Download PDF | 171 KB


Generator Connections - Complaints Procedure

This document outlines the procedure you need to take if you have a complaint about your Connection Offer or other aspects of your Generation connection to the Distribution System.

Download PDF | 40 KB


Windfarm Performance Monitoring Process

This document outlines the process that is adopted by Eirgrid and ESB Networks in monitoring the performance of Wind Farm Power Stations (WFPS) in terms of the categorisation of controllability assigned following regulatory decision SEM-062-11 for priority Dispatch.

Download PDF | 547 KB


Gate 3 Project Plan

This document outlines the high level summary of the System Operators Gate 3 Project Plan.  This revision reflects the impact of the introduction of Distribution contestability on the Plan, and records when PGOR (Possible Generator Output reports) will be available for issue. It also provides the expected date when Final Constraint Reports will be available.

Download PDF | 44 KB


Node Assignments list - Updated 20/05/2011

The System Operators have undertaken to update the node assignments list from time to time to confirm any changes to the Gate 3 tables originally published on the 19th January 2009. Changes are marked in yellow in the document and a footnote is included explaining the high level reason for the change.

Download PDF | 244 KB


Letter of Re-assignment / Novation

In the case of requests for Assignment, you should submit the Letter of Assignment/ Novation requesting to novate the existing Connection Agreement to a New Legal Entity.

Download PDF | 133 KB