We are ESB Networks. We ensure that electricity gets to the homes and businesses of our 2.3 million electricity customers, safely and efficiently. We have invested over €6bn in the electricity network over the last 10 years to ensure that it is reliable and enables communities and businesses in Ireland to grow and develop.
We provide a wide range of services to our customers, all of whom need to be registered with an electricity supplier. Each year we carry out over 9 million meter readings and provide these to your supplier in order to ensure you receive correct billing. We also deliver a range of technical services such as restoring supply when network faults occur, for example due to storms. Other services, some of which are chargeable, include undertaking line alterations at the customer’s request and carrying out service alterations requested via suppliers.
Whether you are a domestic or a commercial customer, we will provide a new electricity connection that best suits your needs.
Your safety is our priority. Electricity is a powerful energy source but it can be dangerous. Always follow our safety guidelines. To ensure you stay safe, stay clear of overhead, underground and fallen electricity wires, always look out for electricity wires when you are outside . ‘Stay safe, stay clear’. For emergencies call 1850 372 999.
Acting responsibly in all aspects of our business is one of our key priorities.
This document outlines the procedure you need to take if you have a complaint about your Connection Offer or other aspects of your Generation connection to the Distribution System.
Download PDF | 40 KB
This document outlines the process that is adopted by Eirgrid and ESB Networks in monitoring the performance of Wind Farm Power Stations (WFPS) in terms of the categorisation of controllability assigned following regulatory decision SEM-062-11 for priority Dispatch.
Download PDF | 547 KB
This document is issued by ESB Networks as a guide to Developers of generation projects to give an understanding of the connection process for both Non-Contestable and Contestable Generator projects.
Download PDF | 306 KB
This document sets out the timeline and the process for roll-out of offers to Gate 2 Groups.
Download PDF | 169 KB
This document lists the line impedance data for 38 Kilovolt.
Download PDF | 46 KB
This document lists the line impedance data for Medium Voltage.
Download PDF | 49 KB
This document explains the conditions to be followed for connecting and operating a Micro-Generator.
Download PDF | 111 KB
The customer connection method sub-group meetings are the primary connection method discussion vehicle for customers, this document is a revised schedule for these meetings.
Download PDF | 12 KB
This correspondence sets out the deadlines within which connection method suggestions have to be submitted to the System Operators (SO's) to ensure that they can be included in connection method studies.
Download PDF | 154 KB
This document outlines the high level summary of the System Operators Gate 3 Project Plan. This revision reflects the impact of the introduction of Distribution contestability on the Plan, and records when PGOR (Possible Generator Output reports) will be available for issue. It also provides the expected date when Final Constraint Reports will be available.
Download PDF | 44 KB