document

DCRP Minutes of Meeting - April 9th, 2013

Minutes of Distribution Code Review Panel Meeting of 09/04/2013 

Download PDF | 48 KB

document

DCRP Minutes of Meeting - June 9th, 2015

Minutes of Distribution Code Review Panel Meeting of 09/06/2015

Download PDF | 203 KB

document

Distribution Code Review Panel Members

Distribution Code Review Panel Members

Download PDF | 257 KB

document

DCRP Minutes of Meeting – 30th September 2014

Distribution Code, Review Panel Meeting, Minutes of Meeting of 30th September 2014

Download PDF | 193 KB

document

Letter of Re-assignment / Novation

In the case of requests for Assignment, you should submit the Letter of Assignment/ Novation requesting to novate the existing Connection Agreement to a New Legal Entity.

Download PDF | 133 KB

document

Guidelines for costs and applicability of EGIP (Embedded Generation Interface Protection).

This documents presents Guidelines for costs and applicability of EGIP (Embedded Generation Interface Protection).

Download PDF | 171 KB

document

Node Assignments list - Updated 20/05/2011

The System Operators have undertaken to update the node assignments list from time to time to confirm any changes to the Gate 3 tables originally published on the 19th January 2009. Changes are marked in yellow in the document and a footnote is included explaining the high level reason for the change.

Download PDF | 244 KB

document

Details on processing applications outside of GPA.

This document outlines the steps by which an application is processed which is not the normal GPA, it also includes factors that make an eligible non GPA application.

Download PDF | 428 KB

document

Supplemental Application for Modifications to Generation Connection Offers

This application form should be completed if your project is being processed within the group processing approach GPA, and you wish the system operators to use assumed project data rather than specific project data provided by you.

Download PDF | 374 KB

document

Gate 3 Project Plan

This document outlines the high level summary of the System Operators Gate 3 Project Plan.  This revision reflects the impact of the introduction of Distribution contestability on the Plan, and records when PGOR (Possible Generator Output reports) will be available for issue. It also provides the expected date when Final Constraint Reports will be available.

Download PDF | 44 KB