document

Letter of Re-assignment / Novation

In the case of requests for Assignment, you should submit the Letter of Assignment/ Novation requesting to novate the existing Connection Agreement to a New Legal Entity.

Download PDF | 133 KB

document

Guidelines for costs and applicability of EGIP (Embedded Generation Interface Protection).

This documents presents Guidelines for costs and applicability of EGIP (Embedded Generation Interface Protection).

Download PDF | 171 KB

document

Node Assignments list - Updated 20/05/2011

The System Operators have undertaken to update the node assignments list from time to time to confirm any changes to the Gate 3 tables originally published on the 19th January 2009. Changes are marked in yellow in the document and a footnote is included explaining the high level reason for the change.

Download PDF | 244 KB

document

Details on processing applications outside of GPA.

This document outlines the steps by which an application is processed which is not the normal GPA, it also includes factors that make an eligible non GPA application.

Download PDF | 428 KB

document

Supplemental Application for Modifications to Generation Connection Offers

This application form should be completed if your project is being processed within the group processing approach GPA, and you wish the system operators to use assumed project data rather than specific project data provided by you.

Download PDF | 374 KB

document

Gate 3 Project Plan

This document outlines the high level summary of the System Operators Gate 3 Project Plan.  This revision reflects the impact of the introduction of Distribution contestability on the Plan, and records when PGOR (Possible Generator Output reports) will be available for issue. It also provides the expected date when Final Constraint Reports will be available.

Download PDF | 44 KB

document

Correspondence from ESB Networks with regard to connection methods

This correspondence sets out the deadlines within which connection method suggestions have to be submitted to the System Operators (SO's) to ensure that they can be included in connection method studies.

Download PDF | 154 KB

document

Customer Connection Method Sub Group Meetings Schedule

The customer connection method sub-group meetings are the primary connection method discussion vehicle for customers, this document is a revised schedule for these meetings.

Download PDF | 12 KB

document

Conditions Governing the Connection and Operation of Micro-generation

This document explains the conditions to be followed for connecting and operating a Micro-Generator.

Download PDF | 111 KB

document

Line impedance data for Medium Voltage

This document lists the line impedance data for Medium Voltage.

Download PDF | 49 KB