Meter Reading Sheet for ESB_ABB Vision Elster A1700

Meter Reading Sheet for Electronic Business Meter type ABB Vision Elster A1700.

Download PDF | 77 KB


New Generator Connection Application (NC5)

This form should be completed by customers who want a new generator connected to the distribution system.

Download PDF | 737 KB


General Conditions for Connection of Industrial and Commercial Customers and Generators to the Distribution System

This document sets out the conditions for connecting a premises to the electricity distribution system for loads greater than or equal to 100 Kilovolt Amps (kVA).

Download PDF | 340 KB

Sparky. 86 x 125 final jpg

Senior Lesson Plan 2 - Staying Safe with Electricity

Teaching Resources - Senior Lesson Plan 2 - Staying Safe with Electricity

Download PDF | 255 KB


Basis of Charges for Connection to the Distribution System

This document sets out the basis on which charges for connection to the Distribution System are calculated and applied by ESB Networks DAC. in its role as the Distribution System Operator.

Download PDF | 178 KB

Electrical and Magnetic Fields

ESB Networks Electrical and Magnetic Fields

In accordance with our desire to deal in an open manner with this issue we are providing you with this information on the subject of electrical and magnetic fields. The quality of your living and working environment, along with the welfare of livestock and farm crops is of the utmost importance to us at all times.

Download PDF | 2 MB


Distribution Annual Compliance Report 2009

This Report outlines the activities undertaken by ESB Networks DAC in relation to the implementation of the Compliance Programme during 2009.

Download PDF | 38 KB


Duct specifications of LV Cable for non-domestic connections - page 2 of 2

This document outlines the Low Voltage duct and trench specifications for Business and Industrial parks.

Download PDF | 326 KB


Correspondence from ESB Networks with regard to connection methods

This correspondence sets out the deadlines within which connection method suggestions have to be submitted to the System Operators (SO's) to ensure that they can be included in connection method studies.

Download PDF | 154 KB


Details on processing applications outside of GPA.

This document outlines the steps by which an application is processed which is not the normal GPA, it also includes factors that make an eligible non GPA application.

Download PDF | 428 KB