38kV & 110kV Station Special Load Readings 2018/2019

38kv & 110kV Station Special Load Readings 2018/2019 | Download PDF 4 MB

Special Load Readings (SLR) are a coincident set of measurements of simultaneous load for all distribution substations. The readings are recorded for 4 times annually as follows:

  • Winter: Measure at 12.30 and 18.00 hours on second Thursday in December. If the second Thursday in December is the 8th then the measurements are taken on the following Tuesday, December 13th.
  • Summer Peak: Measured at 12.30 hours on the fourth Thursday in June.
  • Summer Valley: Measured at 06.00 hours on the Sunday preceding the early August Monday Public Holiday.
FORM

Application for Relocation of Pole or Line (NW1)

This application form is for customers who wish to apply to relocate a pole or line.

Download PDF | 86KB  

Guidebook for Housing Schemes

Electrical Services Guidebook for Housing Schemes

This document provides a guide to the requirements of ESB Networks in relation to electricity installations in housing schemes.

Download PDF | 5 MB

FORM

Connection to a Single Domestic Dwelling or Farm Premises Application (NC2)

This application form is for domestic customers wishing to apply for a connection to the electricity distribution system  for a singe house (urban or rural), farm premises that use loads less than or equal to 29kVa or a family apartment.

Download PDF | 127 KB or Apply ONLINE

FORM

New Generator Connection Application (NC5A)

This form should be completed by customers who want a new generator connected to the distribution system.

Download PDF | 548 KB

FORM

New Generator Connection Application (NC5)

This form should be completed by customers who want a new generator connected to the distribution system.

Download PDF | 737 KB

FORM

New or Changed Unmetered Connections Application (includes public lighting) (NC4)

This application form is for customers who wish to apply for a connection to the electricity distribution system for unmetered connections.  See further information below on when to use this Application Form.

  • Unmetered public lighting of less than 2 Kilovolt-Amperes (kVA) for a Local Authority or builder/developer,
  • Unmetered electric loads (not public lighting) of less than 2 Kilovolt-Amperes (kVA) for customers with connection points, e.g. traffic lights, bus shelters,
  • Unmetered electric loads (not public lighting) of less than 2 Kilovolt-Amperes (kVA) for customers with a single connection point, e.g. electric fences.

Download PDF | 111 KB

FORM

New Connection or Increased/Reduced Capacity (MIC) Application (NC3)

This Application Form is for business customers wishing to apply for a connection to the electricity distribution system for the following:

  • A single commercial/industrial unit
  • Mixed multiple connections, e.g. traffic lights, bus shelters
  • An increase or decrease in your current level of supply (Maximum Import Capacity)
  • Farm premises that use loads of greater than or equal to 30 Kilovolt-Amperes (kVA).

Download PDF | 272 KB or Apply ONLINE

FORM

Multi Unit Development Application (NC1)

This application form is for builders or developers who wish to apply for a connection to the electricity distribution system for  a Multi Unit Development and a Housing Scheme.

Download PDF | 1 MB or Apply ONLINE

FORM

Micro Generation Notification form (NC6)

This application form is for those who wish to apply for a connection to the electricity distribution system for a micro-generator.

Download PDF | 494 KB