document

Distribution HV Substation Transformer Capacity and Load Information

HV Substation transformer capacity and load Information.

Download PDF | 507 KB

Guidebook for Housing Schemes

Electrical Services Guidebook for Housing Schemes

This document provides a guide to the requirements of ESB Networks in relation to electricity installations in housing schemes.

Download PDF | 5 MB

FORM

Connection to a Single Domestic Dwelling or Farm Premises Application (NC2)

This application form is for domestic customers wishing to apply for a connection to the electricity distribution system  for a singe house (urban or rural), farm premises that use loads less than or equal to 29kVa or a family apartment.

Download PDF | 127 KB

FORM

New Generator Connection Application (NC5A)

This form should be completed by customers who want a new generator connected to the distribution system.

Download PDF | 548 KB

FORM

New Generator Connection Application (NC5)

This form should be completed by customers who want a new generator connected to the distribution system.

Download PDF | 737 KB

FORM

New or Changed Unmetered Connections Application (includes public lighting) (NC4)

This application form is for customers who wish to apply for a connection to the electricity distribution system for unmetered connections.  See further information below on when to use this Application Form.

  • Unmetered public lighting of less than 2 Kilovolt-Amperes (kVA) for a Local Authority or builder/developer,
  • Unmetered electric loads (not public lighting) of less than 2 Kilovolt-Amperes (kVA) for customers with connection points, e.g. traffic lights, bus shelters,
  • Unmetered electric loads (not public lighting) of less than 2 Kilovolt-Amperes (kVA) for customers with a single connection point, e.g. electric fences.

Download PDF | 111 KB

FORM

New Connection or Increased/Reduced Capacity (MIC) Application (NC3)

This Application Form is for business customers wishing to apply for a connection to the electricity distribution system for the following:

  • A single commercial/industrial unit
  • Mixed multiple connections, e.g. traffic lights, bus shelters
  • An increase or decrease in your current level of supply (Maximum Import Capacity)
  • Farm premises that use loads of greater than or equal to 30 Kilovolt-Amperes (kVA).

Download PDF | 122 KB

FORM

Multi Unit Development Application (NC1)

This application form is for builders or developers who wish to apply for a connection to the electricity distribution system for  a Multi Unit Development and a Housing Scheme.

Download PDF | 1 MB

FORM

Micro Generation Notification form (NC6)

This application form is for those who wish to apply for a connection to the electricity distribution system for a micro-generator.

Download PDF | 35 KB

document

Large Business Deemed Letter

A letter which accompanies and forms part of a Standard Connection Agreement (SCA) deeming the Agreement to be accepted if the customer continues to use the connection.

Download PDF | 34 KB

Now Viewing: New Connections View All