document

Guide to the Process for Connection of Demand Customers to the Distribution System

This guide is designed to illustrate the steps in obtaining a connection to the Distribution System for demand customers

Download PDF | 534 KB

FORM

DSO Capacity Release Form

On the 10th June 2020, the Commission for Regulation of Utilities (CRU) published a  Decision Paper - Enduring Connection Policy Stage 2 (ECP-2) CRU/20/060 (the “CRU Decision Paper”), following a CRU Consultation - Enduring Connection Policy Stage 2 (ECP-2) - Proposed Decision CRU/19/143. 

As directed by the CRU, this standard application form has been published to facilitate the implementation of Section 2.9 of the CRU Decision Paper. This application form should not be used for any other purpose. 

Download PDF | 202KB
FORM

Connection to a Single Domestic Dwelling or Farm Premises Application (NC2)

This application form is for domestic customers wishing to apply for a connection to the electricity distribution system  for a singe house (urban or rural), farm premises that use loads less than or equal to 29kVa or a family apartment.

Download PDF | 127 KB or Apply ONLINE

FORM

New Connection or Increased/Reduced Capacity (MIC) Application (NC3)

This Application Form is for business customers wishing to apply for a connection to the electricity distribution system for the following:

  • A single commercial/industrial unit
  • Mixed multiple connections, e.g. traffic lights, bus shelters
  • An increase or decrease in your current level of supply (Maximum Import Capacity)
  • Farm premises that use loads of greater than or equal to 30 Kilovolt-Amperes (kVA).

Download PDF | 272 KB or Apply ONLINE

FORM

New Generator Connection Application (NC5)

This form should be completed by customers who want a new generator connected to the distribution system.

Download PDF | 737 KB

FORM

New Generator Connection Application (NC5A)

This form should be completed by customers who want a new generator connected to the distribution system.

Download PDF | 548 KB

FORM

New or Changed Unmetered Connections Application (includes public lighting) (NC4)

This application form is for customers who wish to apply for a connection to the electricity distribution system for unmetered connections.  See further information below on when to use this Application Form.

  • Unmetered public lighting of less than 2 Kilovolt-Amperes (kVA) for a Local Authority or builder/developer,
  • Unmetered electric loads (not public lighting) of less than 2 Kilovolt-Amperes (kVA) for customers with connection points, e.g. traffic lights, bus shelters,
  • Unmetered electric loads (not public lighting) of less than 2 Kilovolt-Amperes (kVA) for customers with a single connection point, e.g. electric fences.

Download PDF | 111 KB

FORM

Micro Generation Notification form (NC6)

This application form is for those who wish to apply for a connection to the electricity distribution system for a micro-generator.

Download PDF | 494 KB

FORM

Multi Unit Development Application (NC1)

This application form is for builders or developers who wish to apply for a connection to the electricity distribution system for  a Multi Unit Development and a Housing Scheme.

Download PDF | 1 MB or Apply ONLINE