document

38kV & 110kV Station Special Load Readings 2018/2019

38kv & 110kV Station Special Load Readings 2018/2019 | Download PDF 4 MB

Special Load Readings (SLR) are a coincident set of measurements of simultaneous load for all distribution substations. The readings are recorded for 4 times annually as follows:

  • Winter: Measure at 12.30 and 18.00 hours on second Thursday in December. If the second Thursday in December is the 8th then the measurements are taken on the following Tuesday, December 13th.
  • Summer Peak: Measured at 12.30 hours on the fourth Thursday in June.
  • Summer Valley: Measured at 06.00 hours on the Sunday preceding the early August Monday Public Holiday.
FORM

DSO Capacity Release Form

On the 10th June 2020, the Commission for Regulation of Utilities (CRU) published a  Decision Paper - Enduring Connection Policy Stage 2 (ECP-2) CRU/20/060 (the “CRU Decision Paper”), following a CRU Consultation - Enduring Connection Policy Stage 2 (ECP-2) - Proposed Decision CRU/19/143. 

As directed by the CRU, this standard application form has been published to facilitate the implementation of Section 2.9 of the CRU Decision Paper. This application form should not be used for any other purpose. 

Download PDF | 202KB
Guidebook for Housing Schemes

Electrical Services Guidebook for Housing Schemes

This document provides a guide to the requirements of ESB Networks in relation to electricity installations in housing schemes.

Download PDF | 5 MB

document

Guide to the Process for Connection of Demand Customers to the Distribution System

This guide is designed to illustrate the steps in obtaining a connection to the Distribution System for demand customers

Download PDF | 534 KB

document

Standard Connection Agreement

Standard Connection agreement for demand and generator connections where the maximum capacity exceeds 100kVA.

Download PDF | 94 KB

document

Large Business Quotation Letter

A quotation letter which accompanies and forms part of a Standard Connection Agreement  when a new or modified connection to a demand only customer requires a payment of a capital contribution.

Download PDF | 53 KB

FORM

Connection to a Single Domestic Dwelling or Farm Premises Application (NC2)

This application form is for domestic customers wishing to apply for a connection to the electricity distribution system  for a singe house (urban or rural), farm premises that use loads less than or equal to 29kVa or a family apartment.

Download PDF | 127 KB or Apply ONLINE

document

Large Business Deemed Letter

A letter which accompanies and forms part of a Standard Connection Agreement (SCA) deeming the Agreement to be accepted if the customer continues to use the connection.

Download PDF | 34 KB

FORM

New Connection or Increased/Reduced Capacity (MIC) Application (NC3)

This Application Form is for business customers wishing to apply for a connection to the electricity distribution system for the following:

  • A single commercial/industrial unit
  • Mixed multiple connections, e.g. traffic lights, bus shelters
  • An increase or decrease in your current level of supply (Maximum Import Capacity)
  • Farm premises that use loads of greater than or equal to 30 Kilovolt-Amperes (kVA).

Download PDF | 272 KB or Apply ONLINE