document

Energised Connected Wind Farms

This document contains statistical information on all Energised Connected Wind Farm generators  to the distribution system and is updated every quarter.

Download PDF | 190 KB

document

ECP-2 Decision CRU/20/060 – Capacity Release DSO Applications

As outlined in Section 2.9 of  the ECP-2 Decision paper, all projects contracted pre ECP-1 (but not those that folded into ECP-1) were given a final opportunity by ESB Networks and Eirgrid to terminate their connection agreement and release their full contracted MEC on the same terms and conditions for capacity release outlined in CER/16/284 (including 80% refund of first stage payment).

Please click the link below to view the full list of DSO Projects who availed of Final Capacity Release:

Download PDF | 125 KB

document

Contracted Wind Farms

This document contains statistical information on all Contracted Wind Farm generators  to the distribution system and is updated every quarter.

Download PDF | 136 KB

document

Energised Connected Non-Wind Generators

This document contains statistical information on all Energised Non-Wind Farm generators to the distribution system and is updated every quarter.

Download PDF | 145 KB |

document

Contracted Non-Wind Generators

This document contains statistical information on all Contracted Non-Wind Farm generators to the distribution system and is updated every quarter.

Download PDF | 137 KB