document

Conditions Governing Connection to the Distribution System

This document sets out the conditions for connecting a premises to the electricity distribution system at Medium Voltage or 38 Kilovolts (kV).

Download PDF | 473 KB

document

General Conditions for Connection of Industrial and Commercial Customers and Generators to the Distribution System

This document sets out the conditions for connecting a premises to the electricity distribution system for loads greater than or equal to 100 Kilovolt Amps (kVA).

Download PDF | 340 KB

document

Conditions for connection to the Distribution System for Customers less than 100kVA

This document sets out the conditions for connecting a premises to the electricity distribution system for loads of less than 100 Kilovolt Amps (kVA).

Download PDF | 67 KB

document

Information Memorandum Longstep Dates for Generation Connection Agreements

This information memorandum clarifies when the right to terminate a Connection Agreement will be enforced.

Download PDF | 173 KB

document

Description of Characteristics of Connection – DUoS and MCC Codes

This document explains the Distribution Use of System (DuoS) and Meter Configuration (MCC) codes that appear in ESB Networks' Connection Agreements.

Download PDF | 24 KB

document

Distribution Loss Adjustment Factors

ESB submission to the Commission for Electricity Regulation.  This document sets out ESB Networks' methodology for calculating Distribution Loss Adjustment factors. These will be used to apportion distribution losses to kWh consumption metered at end-user sites.

Download PDF | 52 KB

document

Rules for Application of DUoS Tariff Group

This document outlines the rules for applying the correct Distribution Use of System tariff (DUoS Group) to a customer premises or connection point.

Download PDF | 269 KB

document

Connection Offer Policy and Process Paper

The purpose and intention of the paper is to provide applicants seeking to connect with a clear set of guidelines in relation to connection offer policy. The policies outlined in this paper generally apply to all categories of renewable and non-renewable generators unless stated otherwise.

Download PDF | 657 KB

document

Contestability on the Distribution System - Key Principles and Processes Paper

The purpose of this paper is for ESB Networks DAC. to set out the principles under which contestability will operate at the Distribution level and as directed under CER/10/056.

Download PDF | 420 KB

Now Viewing: General Conditions & Policies View All