document

Modification No. 44 - 1.1 pu Clarification and Adoption of Declared Supply Voltage

The most recent version of EN 50160, introduced the new parameter of “Declared Supply Voltage”. The voltage at the Connection Point shall be kept within +/- 10% of these values. Up to now, these parameters had not been defined.

Effective Date 11/10/2018

 

Download PDF | 347KB

 

CRU Approval Letter | 59KB

document

Modification No. 45 - Met Signal Requirements

Proposed to remain aligned with a similar Grid Code modification. The modification is proposed to give WFPS the opportunity to discuss acceptable alternative sources for the provision of met data signals.

Effective Date 06/11/2018

Download PDF | 111KB

CRU Approval Letter | 47KB

document

Modification No. 41- DCRP Class Derogation

The CRU has approved Modification No. 41 of the Distribution Code. The purpose of this Modification is to allow the relevant System Operators or Distribution Code Review Panel to propose class derogations to the CRU, rather than requiring each individual affected party to make a bespoke application.

Effective Date 10/10/2017

Download PDF | 393KB

CRU Approval Letter | 44KB