document

EV Pilot Project Report

Pilot Project Report Summary on Preparing for Electric Vehicle on the Irish Distribution System

EV Pilot Project Report | 1.3MB
document

38kV & 110kV Station Special Load Readings 2018/2019

38kv & 110kV Station Special Load Readings 2018/2019 | Download PDF 4 MB

Special Load Readings (SLR) are a coincident set of measurements of simultaneous load for all distribution substations. The readings are recorded for 4 times annually as follows:

  • Winter: Measure at 12.30 and 18.00 hours on second Thursday in December. If the second Thursday in December is the 8th then the measurements are taken on the following Tuesday, December 13th.
  • Summer Peak: Measured at 12.30 hours on the fourth Thursday in June.
  • Summer Valley: Measured at 06.00 hours on the Sunday preceding the early August Monday Public Holiday.
document

Assessment of the scope for higher penetrations of distributed generation on the LV distribution network

ESB Networks is committed to enabling the move towards a low carbon future by enabling technologies and facilitating our customers' transition to a low carbon future.   Our latest report focuses on microgeneration.  Read more here   Assessment of the scope for higher penetrations of distributed generation on the low volage distribution network | Download PDF 8MB

document

Apprenticeship pdf

This pdf contains information about entry requirements for an Electrical/Network Technician Apprenticeship in ESB Networks . It also has details on interview tips and how to apply.

Download pdf | 1 MB

document

ESB Networks 2017 Performance Report

The report covers the performance of ESB Networks’ Business for the year ending December 2017

PDF | 2MB
document

DCRP Minutes 25th October 2019

Minutes of Distribution Code Review Panel Meeting of 25th October 2019

Download PDF | 182 KB
FORM

DSO Capacity Release Form

On the 10th June 2020, the Commission for Regulation of Utilities (CRU) published a  Decision Paper - Enduring Connection Policy Stage 2 (ECP-2) CRU/20/060 (the “CRU Decision Paper”), following a CRU Consultation - Enduring Connection Policy Stage 2 (ECP-2) - Proposed Decision CRU/19/143. 

As directed by the CRU, this standard application form has been published to facilitate the implementation of Section 2.9 of the CRU Decision Paper. This application form should not be used for any other purpose. 

Download PDF | 202KB