Publications

All Publications

14 MB

Site 54 PSA Report

Site 54 PSA Report 
Download PDF

120 KB

Site 54 Recommendations Letter

Site 54 Recommendations letter 
Download PDF

159 KB

Site 58 Recommendations Letter

Site 58 Recommendations letter 
Download PDF

16 MB

Site 59 PSA Report

Site 59 PSA Report 
Download PDF

124 KB

Site 59 Recommendations Letter

Site 59 Recommendation Letter 
Download PDF

127 KB

Site 68 Recommendations Letter

Site 68 Recommendation letter 
Download PDF

303 KB

Smart Metering DP Overview September 2022 - Final

Download PDF

804 KB

Smart Metering September 2022 DPIA Final

Download PDF

609 KB

smarter-hv-and-mv-connections-project---innovation---close-out-report

The project aims to review the current ESB Networks planning and security of supply standard and update and evolve these standards to ensure that they facilitate the objectives of the ESB Networks Innovation Strategy. These novel standards will take account of the requirements of binding National and EU Energy Directives and Network Codes, whilst cost effectively maintaining a safe, secure and reliable distribution system. These novel standards will facilitate the introduction of non secured access for distributed generators and non wires alternative solutions.

The new Standards and Guides have recently been approved by the CRU and are available to view by following the links below.

Distribution System Security and Planning Standards (PDF|1MB)

Non-Wires Alternatives to Network Development Guide (PDF|681KB)

Non-Firm Access for Distribution Connected Distributed Generators Guide (PDF| 494KB)

Download PDF

1014 KB

Specification for Medium Voltage (MV) Substation Buildings (No.13320)

This document provides a guide to the specifications of ESB Networks in relation to Medium Voltage (MV) Substations.

Download PDF

780 KB

Stakeholder Engagement Planned Activities 2022

Download PDF

4 MB

Stakeholder Engagement Report 2022

This report is an annual requirement to enable the Commission for the Regulation of Utilities (CRU) to assess and score ESB Networks’ on the quality, implementation and effectiveness of its stakeholder engagement in the previous year.

Consultation Question

As part of ESB Networks’ ongoing collaboration and communication with our stakeholders, we wish to hear your views on this report and on how ESB Networks’ engaged with you throughout 2022.

Next Steps

Interested stakeholder’s views are invited and all comments and feedback may be sent directly to stakeholder@esbnetworks.ie . Please mark as confidential, if you do not wish for elements of your response to be shared in the subsequent consultation response report.

The consultation period will run from Thursday 23rd March 2023 until 17.00hrs on Tuesday 25th April 2023.

In the meantime we look forward to hearing from you and wish to thank you for your ongoing support and feedback.

Download PDF