Publications

Modifications

107 KB

Modification Proposal #60 - Modification Proposal #60 - Minor Housekeeping/Referencing Modification re RoCoF

CRU has approved Modification No. 60 of the Distribution Code, which was introduced to make corrections to the Distribution Code regarding Rate of Change of Frequency (RoCoF).

Effective Date 04/11/2022.

Download PDF

112 KB

Modification Proposal #59 - Solar PV Signal Requirements

CRU has approved Modification No. 59 of the Distribution Code, which makes changes to Solar PV signal requirements.

Effective Date 04/11/2022.

Download PDF

143 KB

Modification Proposal #58 - Permanent Decommissioning of Generation Units, and the introduction of the term Power Generation Facility Owner (PGFO) in DOC12

CRU has approved Modification No. 58 of the Distribution Code, caters for the permanent decommissioning of generation Units, and introduces the term Power Generation Facility Owner (PGFO ) in DOC12.

Effective Date 08/10/2021.
Download PDF

89 KB

Modification Proposal #57 - Housekeeping and correction of text to reflect the use of a DSO RTU to give effect to Controllability requirements per Mod#36

CRU has approved Modification No. 57 of the Distribution Code, corrects text to reflect the use of a DSO RTU to give effect to Controllability requirements per Mod#36.

Effective Date 11/05/2022.
Download PDF

46 KB

Modification Proposal #56 - Inclusion of RCES for Topology 4-5

CRU has approved Modification No. 56 of the Distribution Code, allows for the inclusion of RCES for Topology 4-5.

Effective Date 11/05/2022.
Download PDF

72 KB

Modification Proposal #55 - Housekeeping and correction to Figure 20 FRT graph

CRU has approved Modification No. 55 of the Distribution Code, corrects an inaccuracy in figure 20.

Effective Date 11/05/2022.

Download PDF

235 KB

Modification Proposal #54 - Housekeeping and correction of transcription errors relating to Reactive Power requirements

CRU has approved Modification No. 54 of the Distribution Code, which was introduced to make corrections to the Distribution Code regarding Reactive Power requirements.

Effective Date 11/05/2022.

Download PDF

106 KB

Modification Proposal #53 - Met Masts Data Requirements

CRU has approved Modification No. 53 of the Distribution Code, which makes changes to Met Mast data requirements.

Effective Date 11/05/2022.

Download PDF

125 KB

Modification Proposal #52 - New topology 1A

CRU has approved Modification No. 52 of the Distribution Code, which incorporates additional content into the Distribution Code to facilitate the adoption of new Topology 1A.

Effective Date 08/10/2021

Download PDF

152 KB

Modification Proposal #51 - RfG and DCC Operational Notification

CRU has approved Modification No. 51 of the Distribution Code, which incorporates additional content into the Distribution Code to facilitate the adoption of Operational Notification processes as mandated by the RfG EU Network Code, and adoption of Operational Notification and Compliance processes as mandated by the DCC EU Network Code (Articles 31-42).

Effective Date 08/10/2021

Download PDF

310 KB

Modification Proposal #50 - Scheduled Data requirements for DSO-connected generation as required by SOGL

CRU has approved Modification No. 50 of the Distribution Code, which incorporates additional content into the Distribution Code to facilitate Scheduled Data requirements for DSO-connected generation as required by SOGL EU Network Code.

Effective Date 08/10/2021

Download PDF

711 KB

Modification Proposal #49 - Reactive Power Housekeeping Correction - Clarification - Oct 2020

CRU has approved Modification No. 49 of the Distribution Code, which incorporates a number of housekeeping corrections/clarifications to the Distribution Code relating to reactive power.

Effective Date 08/10/2021

Download PDF
1 / 4
1 2 3 4