Publications

General Conditions & Policies

1 MB

Conditions Governing the Connection and Operation of Export Limiting Schemes (ELS) at LV and MV

This document is to facilitate the installation of generation at demand sites within the scope of Mini-Generation and Small Scale Generation, as defined in the "Conditions Governing the Connection and Operation of Mini-Generation" and the "Conditions Governing the Connection and Operation of Small Scale Generation".

Download PDF

67 KB

Conditions for connection to the Distribution System for Customers less than 100kVA

This document sets out the conditions for connecting a premises to the electricity distribution system for loads of less than 100 Kilovolt Amps (kVA).

Download PDF

1 MB

Conditions Governing Connection to the Distribution System

This document sets out the conditions for connecting a premises to the electricity distribution system at Medium Voltage or 38 Kilovolts (kV).

Download PDF

582 KB

Conditions Governing the Connection and Operation of Mini-Generation

This document provides information for LV connected demand customers, with an installed generation capacity up to an installed capacity of 72 A single-phase (c. 17 kVA) or 72 A per phase three-phase (c. 50 kVA), termed "Mini-Generation".

Download PDF

657 KB

Connection Offer Policy and Process Paper

The purpose and intention of the paper is to provide applicants seeking to connect with a clear set of guidelines in relation to connection offer policy. The policies outlined in this paper generally apply to all categories of renewable and non-renewable generators unless stated otherwise.

Download PDF

420 KB

Contestability on the Distribution System– ESB Networks Key Principles and Processes Paper

The purpose of this paper is for ESB Networks DAC. to set out the principles under which contestability will operate at the Distribution level and as directed under CER/10/056.

Download PDF

24 KB

Description of Characteristics of Connection – DUoS and MCC Codes

This document explains the Distribution Use of System (DuoS) and Meter Configuration (MCC) codes that appear in ESB Networks' Connection Agreements.

Download PDF

52 KB

Distribution Loss Adjustment Factors - ESB Submission to the Commission for Electricity Regulation

ESB submission to the Commission for Electricity Regulation.  This document sets out ESB Networks' methodology for calculating Distribution Loss Adjustment factors. These will be used to apportion distribution losses to kWh consumption metered at end-user sites.

Download PDF

631 KB

General Conditions for Connection of Industrial and Commercial Customers and Generators to the Distribution System

This document sets out the conditions for connecting a premises to the electricity distribution system for loads greater than or equal to 100 Kilovolt Amps (kVA).

Download PDF

173 KB

Information Memorandum Longstep Dates for Generation Connection Agreements

This information memorandum clarifies when the right to terminate a Connection Agreement will be enforced.

Download PDF

267 KB

Load Indices Guide DOC-101121-HFJ

This document outlines ESB Networks’ Load Indices Approach to be applied by ESB Networks from Price Review 5 onwards.  Load Indices are used by the Distribution Planning and Customer Access Department within Asset Management to manage and track changes in the peak loading at High Voltage Stations and to use this as another tool to prioritise reinforcement activities.

 

Download PDF

269 KB

Rules for Application of DUoS Tariff Group

This document outlines the rules for applying the correct Distribution Use of System tariff (DUoS Group) to a customer premises or connection point.

Download PDF
1 / 1
1