Project Time Frame & Typical Pricing

Once you have all of the documentation required, the application process should only take 10 to 15 minutes.

We aim to provide a quotation and Development Agreement within 90 business days of receiving a completed application.

Connection costs are calculated on the basis of standard CRU approved charges detailed in the document Charges for Connection to the Distribution System PDF | 178 KB.  Further information about connection charges can be found in the ESB Networks DAC Statement of Charges PDF | 308 KB.

For connections that support large electrical loads, considerable time may be required to establish the most appropriate connection method, determine costs and carry out the work required. Project time frames will vary depending upon the extent of the work required, material lead times, and the Customer’s works schedule.