This means we have received your signed Connection Agreement and payment, and we have begun the Design stage of your connection.
This involves carrying out a detailed design and securing any necessary permissions or wayleaves from landowners. When these permissions have been granted, construction of your connection can begin. In some cases it may be necessary to erect a new pole on your site within 50 meters of the outdoor meter cabinet. Read your Welcome Pack (sent with your quotation) for more information on outdoor meter cabinet positioning.